• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

Commercial contractor study guide (1)

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

Commercial contractor study guide (1)

Vista previa del contenido

Commercial contractor study guide
Do all septic tanks need to be constructed on site - ANS-No, only large ones

How large should the first compartment of the first septic tank be - ANS-At least 2/3 the
volume of the total 24 hour flow

Minimum septic tank size - ANS-1000 gallons

Tanks shall be constructed with what size and material tee, - ANS-4inch pvc, I let and
outlet

How deep should tees extend? - ANS-Into the liquid a minimum of 25% and maximum
50% depth

Where should the invert of the outlet tee be located - ANS-2inch below the invert of the
inlet tee

How long should a tank be - ANS-1 1/2 times the width

How many compartments should a tank have - ANS-2

Where should the tank compartment partitions be located - ANS-A point no less than
2/3 and no more than 3/4 the length of the tank from the inlet end

How should compartment partitions be constructed - ANS-So a pass thru hole equal to
or greater than the diameter of the inlet pipe is positioned below the liquid surface a
minimum of 25% to a max of 50% of total liquid depth

Should the walls and bottoms of a poured in septic tank be reinforced - ANS-Yes

How can reinforcing (pour in tank) be accomplished? - ANS-Using a minimum 6 inch by
6 inch no.10 gage welded Steel reinforcing wire or fibrous reinforcing conforming to
ASTM specifications

How should tank lids be reinforced? - ANS-Using 3/8 inch steel reinforcing rods which
shall be spaced 12 inch on center each way extending a minimum of 2 1/2 inch and a
max of 3 inch

, In general How much should a tank be able to withstand how much - ANS-A uniform
live load of 150 pounds per square foot in addition to all the loads to which an
underground tank is normally subjected

When should additional reinforcement be required - ANS-When loads on a concrete
tank are exceeded by subjecting it to a vehicular traffic or when the top of the tank is
placed deeper than three feet below the finished grade.

What is the minimum thickness of walls bottoms and lids of poured in tanks - ANS-4
inch

How should take lids be constructed - ANS-One or two pieces , securable, moveable
access openings located so the inlet and outlet tees can be readily accessed

Access openings min and max - ANS-Min 15 inch free space max 24

Tanks w more than 12 in cover must.... - ANS-Extend access openings to signing 12
inch of ground surface

Pour in place concrete comprehensive strength (how many days per square inch) -
ANS-28 day of 4000 lbs per square inch

How to eliminate honeycomb for concrete - ANS-Vibrating

Whose responsibility of quality of product - ANS-Contractor

Minimum filed line length - ANS-500ft w dosing device

Systems More than 1000 feet need what - ANS-Alternating pumps w alternating fields

When 2 piece dosing tanks are used what must they be joined by - ANS-Mastic butyl
rubber or other pliable sealant water proof corrosion resistant

Is there required length for dosing tank - ANS-No

Can dosing tank have single compartment - ANS-Yes

If partition is used in dosing tank, it must have how many holes, how larger and how far
above tank bottom - ANS-Two four inch holes no more than 12 inch above tank bottom

Información del documento

Subido en
3 de agosto de 2024
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$8.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Ace360PRO
4.7
(108)
Vendido
262
Seguidores
3
Artículos
10566
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes