• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 1 fuera de 3 páginas
Examen

CLC 005 Review Study Guide Test.

Document preview thumbnail
Vista previa 1 fuera de 3 páginas

CLC 005 Review Study Guide Test. Quotes have been received from five vendors in response to your Request for Quotation. They are: VENDOR A- 62000; Vendor B- 61000; Vendor C 60000; Vendor D: 55000; Vendor E-37500. What should be your next step? - CORRECT ANSWER Award to Vendor E as the low price offeror A request for quotation with a subsequent purchase order You received a purchase request for a maintenance agreement for vehicles in your Posts transport unit. The requiring activities tells you that due to warranty considerations, the vehicles must be repaired by a specific company--the only authorized source for maintenance. Is this requirement suitable for an unpriced purchase order? Why or why not? - CORRECT ANSWER Yes. The requirement is for services and materials available from only one source, and the cost can not be readily established beforehand Select the appropriate contractor for award. The contracting officer is reviewing the technical recommendation for awarding to ABC inc. does not have a relevant past performance history. The two other quorers have a history: Both show negative past performance ratings. ABC Inc. Should receive a past performance rating - CORRECT ANSWER Positive You received a requirement for 10,000 modified combat boots (steel safety toes and armored soles) at approximately $200 each. Your contracting office has a blanket purchase agreement (BPA) with leather shoes, inc. for those non commercial items. You are an authorized caller under the BPA. what is the maximum value of the call you can place for these non commercial items? - CORRECT ANSWER 150,000 You receive three quotes in response to your request for quotation for the purchase of calibration equipment for your installation's transportation unit. Two of the quotes meet the requirements fo the QRF but the third one, from Tru Tone inc,. Does not. It changed the delivery date to 10 days later than what was specified in the RFQ. The price quoted by True Tone falls in the middle of the three quotes. The action you should take is: - CORRECT ANSWER Ask your customer if a change in the delivery date would have a negative impact on mission accomplishment


Información del documento

Subido en
26 de julio de 2024
Número de páginas
3
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ROSEGRADES
3.4
(35)
Vendido
236
Seguidores
87
Artículos
12121
Última venta
1 mes hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.