• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 18 páginas
Examen

LEED AP BD+C Practice Exam Pool E (1)

Document preview thumbnail
Vista previa 3 fuera de 18 páginas

LEED AP BD+C Practice Exam Pool E (1)

Vista previa del contenido

A project team member has excluded a section of land in order to meet the
requirements of one of the LEED credits. Which statement is true about this action?

A. Certain sections of land can be excluded from the site boundary if a responsible
party submits a licensed professional exemption form.

B. This action is not allowed.

C. This action is only allowed if a project narrative is written to explain the exclusion.

D. This action is allowed if the gross floor area of the LEED project building is less
than 2% of the gross land area within the LEED project boundary. - CORRECT
ANSWER-B. This action is not allowed.

This is correct.

Land cannot be excluded for the purposes of complying with a credit/prerequisite.
This is known as gerrymandering.




The coordination of energy and water systems for the Integrative Process credit
should be addressed before which phase?

A. Conceptual design

B. Design development

C. Schematic design

D. Evaluation - CORRECT ANSWER-C. Schematic design




For Integrative Process credit which factors must project teams assess through
simple box energy modeling before completion of schematic design?

A. At least one load reduction strategy and one energy efficiency strategy

B. At least one source of renewable energy

C. At least one way to increase efficiency

,D. At least two potential load reduction strategies - CORRECT ANSWER-D. At least
two potential load reduction strategies




There are seven aspects to consider for energy analysis:

Site conditions

Massing and orientation

Building envelope attributes

Lighting levels

Thermal comfort ranges

Plug and process load needs

Programmatic and operational parameters




Project teams must assess at least two potential strategies for each aspect (so at
least a total of 14 things are being checked)




Which water-budget information provides enough data for use in the Discovery
phase of water-related systems?

A. A week's worth of data showing that 5,000 gallons (18,900 lite

rs) of water will be used

B. Data revealing that the building's indoor fixtures will use 10,000 gallons of water
(37,854 liters)

C. Data indicating that makeup water will be negligible

D. Data concluding that a rainwater collection system will supply 20,000 gallons
(75,708 liters) of water per year - CORRECT ANSWER-A. A week's worth of data
showing that 5,000 gallons (18,900 liters) of water will be used

, Water budgets are associated with a specific period of time (week, month, or year)
and a quantity of water (gallons or liters), both of which are included in this choice.

Water budgets need to include indoor, outdoor, process, makeup water, and on-site
supply water offsets.




A university housing project with 100 one-bedroom apartments has a baseline
parking capacity of 1 parking space/unit from the ITE handbook. The project will earn
1 point under LT Credit Surrounding Density and Diverse Uses but not earn LT Credit
Access to Quality Transit. The project includes off-street parking. How many
preferred parking spaces for carpools must the project include for LT Credit Reduced
Parking Footprint? - CORRECT ANSWER-3 spaces




A 40% reduction is required for projects that DO earn points under either LT Credit
Surrounding Density and Diverse Uses or LT Credit Access to Quality Transit.This
project has earned one of the credits, so a 40% reduction is required.

If any off-street parking spaces are provided, the project must include preferred
parking for carpools for 5% of the total parking capacity. The preferred parking is
calculated AFTER the reductions have been made. 100 spaces baseline from the
ITE handbook X 60% (40% reduction) = 60 total spaces60 spaces X 5% preferred
parking = 3 spaces




A commercial office project is adjacent to an existing movie theater. Which action is
an examples of transportation demand strategies that a project team could
implement to reduce parking demand?

A. Designate employee parking

B. Share the parking lot with the movie theater

C. Install preferred parking for carpools

D. All of the Above - CORRECT ANSWER-B. Share the parking lot with the movie
theater

Información del documento

Subido en
18 de julio de 2024
Número de páginas
18
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$8.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
scholartutor
4.8
(923)
Vendido
2789
Seguidores
3
Artículos
10777
Última venta
4 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes