• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Examen

Shp Final With Complete Solutions

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

SHP FINAL WITH COMPLETE SOLUTIONS

Vista previa del contenido

SHP FINAL WITH COMPLETE
SOLUTIONS 100% 2023/2024


True - answer-The firefighter may be installed next to a stand-alone battery
smoke detector

False - answer-When performing a full system test, you may bypass any open
doors or windows

Always enable the emergency - answer-When programming an skey1,you must

False - answer-When running power to the take345,polarity doesn't apply

Audible alarm (7) - answer-When programming the emergency key for the
skey1,which zone/sensor type is used.

True - answer-When installing a smkt3,you must use the included screws and
anchors

True - answer-When installing the firefighter, it is required to test the customers
existing smoke detectors

Between 6"(15cm) and 2'(61cm) from floor - answer-When installing a Dw21,
where is the approved location for the sensor

Provided double sided tape - answer-When installing a dw11 on a vinyl or metal
frame, what should primarily use to mount the sensor

Beans & wire caps - answer-Which of the following materials can you use to
group multiple ground terminals in a takeover.

Smoke detector - answer-Which of the following sensors are you not allowed to
program using a translator

, True - answer-When installing the take345, you must always test the new 12v
battery before using it.

16.5 - answer-What is the output voltage of transformer used to power the sky
control

12" - answer-What is the minimum distance for placement of a co3 from the
corners of the wall

False - answer-The smkt3 has 2 function:smoke and heat detection

Loop 1 Zone 14 - answer-How would you program a co3 if mounted on a hallway
wall

False - answer-When installing a translator, you must program all of the existing
sensors as new equipment on the panel

True - answer-The dw21 should always be installed in the door frame

(09) Smoke detector. (09) Heat detector. (08) Freeze - answer-Which of the
following zone/sensor types are correct when programming an smkt3

7ft - answer-What it the correct height ar which to install the Pir2

Loop 2 - answer-When programming a Dw21 what loop number is used

True - answer-When programming a sensor into a sky control panel, you can
type in the serial number or learn it in by triggering the device.

Loop 1 Zone 3 - answer-How would you program a gb2 when it is mounted on a
master bedroom ceiling

True - answer-Panic pendants are programmed as an audible alarm(type 07)

True - answer-When installing the take 345 you must ensure that the transformer
is supplying power to the power supply before connecting the battery

Información del documento

Subido en
6 de julio de 2024
Número de páginas
6
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
LearnWithLeo
4.8
(225)
Vendido
2632
Seguidores
13
Artículos
6514
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes