SWPPP study guide

Clean Water Act - ANS-Law set into place in 1970 for storm water regulation

NPDES - ANS-Regulations for monitoring storm water activity on a construction site, are
outlined in

Immediately after project is awarded and before you begin any site work - ANS-When
should you read and understand SWPP

Contaminated ground water - ANS-What is not an allowable storm water discharge or
non-storm water discharge

When jurisdiction of operations specifies you can start - ANS-When may construction
activity begin

303D list - ANS-Waters that fail anti-degradation list are placed on which list.

An officer and project owner - ANS-SWPPPs certification are signed by who

FALSE - ANS-The document that must be completed signed and submitted to the state
to obtain authorization to discharge is the NOT. (T/F)

All construction has been completed both inside and outside - ANS-NOT can be filed
when

is in charge of daily activities - ANS-Operations on a construction site are the entity in
charge of plans and specification and the entity who?

Stay out of trouble with the law - ANS-Motives for staying in compliance with storm
water objectives?

To protect and preserve beneficial use of U.S. waters, maintaining their clean, physical
and biological integrity - ANS-Objectives of the clean water act are

National Pollutant Discharge Elimination System - ANS-NPDES stands for

, Site description and maps, inspection and maintenance procedure. Potential pollutant
sources, schedules of activities, site contact information, plan certification documents,
site contact info and descriptions of controls BMP - ANS-Which are a component of a
good SWPPP

False - ANS-Construction sediment is not considered a potential pollutant source (T/F)

Project owner, SWPPP designer - ANS-When modifying or substituting a storm water
BMP the contractor must consult with

False - ANS-NOI must be submitted to the appropriate agency before the storm water
pollution preventive plan is developed (T/F)

False, 303d List - ANS-Name of the list with impaired waters is called totally daily
maximum load (T/F)

It is required by law, it documents storm water management activity on your site, and it
demonstrates your intent to manage storm water on your site - ANS-You should have a
SWPPP for your construction site because?

Site specific - ANS-A well constructed SWPPP for your site should be?

Prior to commencing construction - ANS-The NOI must be submitted when?

Schedule of activities - ANS-One necessary component of a good SWPPP is?

Weather and Climate - ANS-Factors that may impact SWPPP scheduling activities
include

masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc -
ANS-Pollutant sources on a construction may include

Seek written approval of the project SWPPP designer or project owner - ANS-If you
believe BMP modification are necessary to the site you must?

Endangered species and historical preservation - ANS-The following consideration may
be incorporated into the SWPPP?

Site maps, erosion sediment control, BMPs, site specific sequences of construction
activities - ANS-The SWPPP will contain the following?

Información del documento

Subido en
4 de julio de 2024
Número de páginas
10
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GOLDSOLUTIONS
4.5
(125)
Vendido
12412
Seguidores
61
Artículos
17798
Última venta
3 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes