• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 7 páginas
Examen

VA Contractor General Questions With Complete Solutions.

Document preview thumbnail
Vista previa 2 fuera de 7 páginas

A class A license is required when a single contract is worth more than? - $120,000.00 A construction project does not require inspection if the cost is less this maximum amount. - $2500 A contractor does not notify a change of address and so does not receive a timely Notice of Renewal. Who is responsible for when the contractor does not renew his license on time? - The Licensee Contractor A contractor is required to submit a renewal within____ days of the expiration date? - 30 A contractor must apply for reinstatement rather than renewal if the renewal application and fee are not submitted within how many days of expiration? - 30 days A copy of the building permit must be - posted at the site A designated employee must work a minimum of how many hours for licensed contracting business? - 30 Hours A Designated Employee should be? - At least 18, Full Time, Passed Required Exams A license was issued on 10/15/2003. The expiration date is? - 10/31/2005 A new building may be used after ______________ is issued. - certificate of occupancy A notification that funds are due is issued, but the funds are not paid. After a second notice, the funds must be paid in ______ days. If there is still no payment, then the license is ____________. - 30 days, SuspendedA permit has been issued and construction is underway. The inspection must take place in? - six months Accrual Basis Accounting - reporting income when it is earned After notification by the code official, an application for a permit shall be considered to have been abandoned for _____ months - 6 All of the following are required on a written contract EXCEPT - permit numbers An appeal of the local building officials decision to refuse to grant a modification to the USBC MUST be made within how many days? - 90 Days An Erosion control conservation plan needs to be approved within ____ days. - 45 An erosion control conservation specification needs to be approved within_____ days - 60 days An owner wantsa swimming pool built in a specified location,. The location is in violation of the local code. The contractor should. - Not agree to build the pool Any issued permit shall become invalid if work is not commenced within _________ Months after issuance. - 6 Months Assets - Liabilities + Owner's Equity Bid Price - (Dir Cost * 100 ) / (100-%) Bids are - compteitive Cash Method - revenue is not recorded until cash (or a check) is actually received


Información del documento

Subido en
22 de junio de 2024
Número de páginas
7
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$8.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
4
Seguidores
0
Artículos
1105
Última venta
9 meses hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.