• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 6 fuera de 43 páginas
Otro

Unit 9 Project Management Assignment B, C & D (Distinction Level)

Document preview thumbnail
Vista previa 6 fuera de 43 páginas

This document contains all you need to get a distinction in learning aim B, C and D with all criteria met. Feel free to message me for any questions or inquiries.

Vista previa del contenido

UNIT 9 PROJECT MANAGEMENT ASSIGNMENT B, C & D




BTEC Level 3
Diploma in
Information
Technology BTEC
Level 3 Extended
Diploma in
Information
Technology
Unit 9: IT Project Management
LEARNING AIM B, C & D

B: CARRY OUT A PROJECT INITIATION FOR AN IT PROJECT

C: CARRY OUT THE PLANNING, EXECUTION, MONITORING AND CONTROLLING OF
AN IT PROJECT, USING AN APPROPRIATE METHODOLOGY




1

, UNIT 9 PROJECT MANAGEMENT ASSIGNMENT B, C & D



D: UNDERTAKE THE CLOSURE OF A PROJECT BY REFLECTING ON THE SUCCESS OF PERSONAL
PERFORMANCE AND THE PROJECT OUTCOME

Assessor:

Hand out date: 26th April2024

Hand in deadline: 24th May 2024



Student name:

Student No:



Introduction.....................................................................................................3
Project Initiation Document.............................................................................4
Document Details............................................................................................4
Approvals.........................................................................................................5
Distribution......................................................................................................5
Purpose of the Project Initiation Document.....................................................6
Research for project:........................................................................................6
Objectives......................................................................................................20
Scope.............................................................................................................21
Business Case..........................................................................................22
Assumptions..................................................................................................23
Constraints.....................................................................................................25
Risk Management Strategy............................................................................27
Deliverables...................................................................................................29
Stakeholders..................................................................................................31
Project Management Team Structure/Organisational chart...........................32
Communication Plan...................................................................................32
P8...................................................................................................................36
P9...................................................................................................................38
M4..................................................................................................................39



2

, UNIT 9 PROJECT MANAGEMENT ASSIGNMENT B, C & D



D4..................................................................................................................41
Bibliography...................................................................................................42




Introduction
I have recently been recruited by a new software company as a trainee
project manager and have been asked to manage the development of a
budget proposal for specific computer rooms for a college. In this report, I
will be researching, evaluation and identifying risks and constraints for the
solution to the IT. I will also include a feasibility study and will include




3

, UNIT 9 PROJECT MANAGEMENT ASSIGNMENT B, C & D



evidence of the project [phasing for the user requirements, regular meetings
and budget and resource control with the relevant screenshots needed.

Project Initiation Document
Project Details

Project Title: Redesigning IT classrooms


Project Sponsor Name: Paulette Languerand


Project Client Name: SGS (South Gloucestershire and Stroud)
College


Project Manager Name:


Start Date: 24/04/24


Completion Date: 26/05/24


Estimated Cost: £471,450




Document Details
Version Modifications Author Date
1 Started the document Layode Esther 26/04/24
2 Made changes to the Layode Esther 10/05/24
initial plan

3 Made changes to the Layode Esther 12/05/24
deliverables

4 Made suggestions and Layode Esther 15/05/24
collected feedback




4

, UNIT 9 PROJECT MANAGEMENT ASSIGNMENT B, C & D




Approvals
This document requires the following approvals:

Name Role Signature Date Version
Paulette Sponsor P.L 26/04/24 1
Languerand
Roger Ellis Lecturer R.E 26/04/24 1
Dilupa Lecturer D.C 26/04/24 1
Chandraseka
ra
Prabashi Lecturer P.W 26/04/24 1
wadanamby
Paula Spiers Lecturer P.S 26/04/24 1


Distribution
This document has been distributed to:

Name Role Date of Issue Version
Paulette Learning Area 24/05/2024 1
Languerand Manager

Roger Ellis Lecturer 24/05/2024 1

Dilupa Tutor/Lecturer 24/05/2024 1
Chandrasekara

Prabashi Network 24/05/2024 1
wadanamby Architect

Bikram Khastgir Finance Advisor 24/05/24 1

Sarah Janes Principal 24/05/24 1

Esther Layode Project Manager 24/05/24 1

SGS College Client 24/05/24 1




5

, UNIT 9 PROJECT MANAGEMENT ASSIGNMENT B, C & D




Purpose of the Project Initiation Document
As a trainee project manager for the development of a budget proposal for a
suite of subject-specific computer rooms at a further education college, it is
essential to understand the current state of the classrooms, the necessary IT
devices needed, and the new plan and structure for the classrooms. I have
looked at various types of equipment and related expenses that the college
is considering buying for the project. I have looked over the sizes and costs
of the whiteboards that are for sale. I also plan to research the types and
prices of chairs and tables that the college might want to purchase. Students
will use these chairs and tables while they participate in hands-on learning
activities in the middle of the classroom.

The classroom's physical layout includes standard desks and chairs, space,
lighting and ventilation systems, and basic overhead lighting and ventilation
systems.

The present IT infrastructure includes older desktop computers, basic wired
network infrastructure with limited Wi-Fi coverage, peripheral devices such
as printers, projectors, and possibly outdated whiteboards, and standard
educational software. To enhance the classroom, the project will include
high-performance computers, monitors, servers, networking equipment,
interactive whiteboards/Smart Boards, printers and scanners, audio-visual
equipment, Learning Management Systems (LMS), and security software.

The research on the new plan and structure of the classroom will focus on
collaborative learning spaces and appropriate learning environments. Design
considerations include ergonomics, flexible layouts, sufficient power outlets,
and adequate storage for the pc. These steps need assessment, space
planning, budgeting, vendor selection, pilot testing, training, and
maintenance and support.



Research for project:
Materials/Secondary research findings

The proposed budget for the IT classroom is 471,450. £220,000 for IT
classrooms, including high-performance computers, networking equipment,
interactive whiteboards, printers and scanners, audio-visual equipment,
software licenses, furniture and fixtures, cabling and installation, and a



6

Información del documento

Nivel de Estudio
Tema
Subido en
21 de junio de 2024
Número de páginas
43
Escrito en
2023/2024
Tipo
Otro
Personaje
Desconocido
$23.64

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
tomisinlayode
4.1
(11)
Vendido
71
Seguidores
27
Artículos
21
Última venta
4 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes