CQM Student Study Guide (Module 2) Exam With Complete Correct Solutions!!
1. Name three instances of contractor extension of designs. - ANSWER Fire alarm, pre-engineer building, structural, concrete reinforce details. 2. Name some possible areas that must be addressed during the contractor's coordination review of plans and specifications. - ANSWER Site conditions and restraints, Conflicts and discrepancies between plans and specifications. 3. What are the responsibilities of the QC manager during the design phase of a design build project? - ANSWER Ensure the design meets the plans and specs, RFI are submitted correctly.