OPERATIONS MANAGEMENT FINAL EXAM SOLVED #16
Balance delay - correct answer the total idle time of an assembly line

Best operating level - correct answer the percent of capacity utilization at which unit
costs are lowest

Block diagram - correct answer a schematic layout diagram that includes that size of
each work area

Capacity - correct answer the maximum capacility to produce

Capacity cushion - correct answer a percent of capacity held in reserve for unexpected
occurences

Capacity planning - correct answer a long-term strategic decision that establishes the
overall level of productive resources for a firm

Cellular layout - correct answer a layout that creates individual cells to process parts or
customers with similar requirements

Cycle time - correct answer the maximum amount of time an item is allowed to spend at
each workstation if the targeted production rate is to be achieved; also, the time
between successive product completions

Diseconomies of scale - correct answer when higher levels of output cost more per unit
to produce

Economies of scale - correct answer when it costs less per unit to product higher levels
of output

Facility layout - correct answer the arrangement of machines, departments,
workstations, and other areas within a facility

Fixed-position layout - correct answer a layout in which the product remains at a
stationary site for the entire manufacturing cycle

Flexible manufacturing system (fms) - correct answer programmable equipment
connected by an automated material-handling system and controlled by a central
computer

Line balancing - correct answer a layout technique that attempts to equalize that
amount of work assigned to each workstation on an assembly line

Mixed-model assembly line - correct answer an assembly line that processes more than
one product model

, Muther's grid - correct answer a formate for displaying manager preferences for
department locations

Precedence requirements - correct answer physical restrictions on the order in which
operations are performed

Process layout - correct answer a layout that groups similar activities together into work
centers according to the process or function they perform

Product layout - correct answer a layout that arranges activities in a line according to
the sequence of operations that are needed to assemble a particular product

Production flow analysis (pfa) - correct answer a group technology technique that
reorders part routing matrices to identify families of parts with similar processing
requirements

Relationship diagram - correct answer a schematic diagram that denotes location
preference with different line thicknesses

Unit load - correct answer the quantity in which material is normally moved, such as a
unit at a time, a pallet, or a bin of material

Contraints - correct answer linear relationships of decision variables representing the
restrictions placed on the decision situation by the operating environment

Decision variables - correct answer mathematical symbols that represent levels of
activity of an operation

Extreme points - correct answer corner points, or protrusions, on the boundary of the
feasible solution space in a linear programming model

Feasible solution space - correct answer an area that satisfies all contraints in a linear
programming model simultaneously

Graphical solution method - correct answer a method for determining the solution of a
linear programming problem using a two-dimensional graph of the model

Linear programming - correct answer a technique for general decision situations in
which the decision is to determine a level of operational activity in order to achieve an
objective, subject to restrictions

Objective function - correct answer a linear mathematical relationship that describes the
objective of an operation in terms of decision variables

Optimal solution - correct answer the single best solution to a problem

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
8 de junio de 2024
Número de páginas
10
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
puritywanjihia
5.0
(2)

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
puritywanjihia havard
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
3
Miembro desde
2 año
Número de seguidores
1
Documentos
484
Última venta
4 meses hace
THE BOOK STORE LIMITED CORPORATION

A+ DOCUMENTS i.e, Test Banks ,Revision Guide etc Visit my site to get lecture notes summaries and practice questions to acquire higher grades in your exams. Let us excel together!!!!!. I know how frustrating it can get with all the assignments mate. I have taken my quality time to review and gather as many documents from different courses .Thanks.

5.0

2 reseñas

5
2
4
0
3
0
2
0
1
0

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes