C-10 Electrical Part 1 Questions and Verified Answers | Passed | A+
1. Takeoffs of conduit are categorized into ______. : Power distribution, branch lighting, and branch power 2. Raceways are taken off per _____. Fittings required to make turns and extensions are taking off per _____. : Linear foot, each 3. All wires and conductors are taken off per _____. : Linear foot 4. All fittings, devices and boxes are taken off per _____. : Each Item 5. Permits and fees for tie-ins may be listed at lump sum and are taken off per _____. : Occurrence,Project, and Contract 2 6. Control stations are taken off by _______. : Individual Unit and Each Item. 7. Panelboards are taken off individually according to ______. : Type, Size, and Voltage 8. Starters, safety switches and fuses are taken off per _______. : Each Item 9. _______ should be kept separate from general light fixtures. : Exit Lighting 10. Interior and exterior lighting should be taken off and listed _______. : Separatel
Información del documento
- Subido en
- 6 de junio de 2024
- Número de páginas
- 35
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas