• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 16 páginas
Examen

Safe Practitioner Latest Edition 2024 Solution 100% Correct Guaranteed Grade A+

Document preview thumbnail
Vista previa 3 fuera de 16 páginas

Product Management is responsible for "what gets built" as defined by the Vision, Roadmap, and what else? A) Program Backlog B) Customers C) Key Stakeholders D) PI Planning Program Backlog Which activity happens in the Inspect and Adapt Workshop? A) A retrospective of the iteration B) Planning the next PI C) A demo of the integrated system D) Refreshing the Program Backlog A demo of the integrated system When is the system demo conducted during program execution? A) At the end of every iteration B) On demand C) Midway through the Program Increment D) When Features are done At the end of every iteration Which statement is true about iteration planning? A) It is required for every iteration to enable fast learning cycles B) It is only required for every third iteration C) It is required for component teams but may not be required for feature teams that have no dependencies on other teams D) It is not required for teams that consistently meet their PI Objectives It is required for every iteration to enable fast learning cycles A user story includes which three things? (Choose three) A) How B) Why C) What D) Where E) Who F) When Who, What, and Why A decrease in variability leads to an increase in what? A) Predictability B) Risk C) Cost D) Length Predictability What is the one key benefit of a Backlog Refinement session? A) It allows the team to state the problem and then think about, what where when and impact B) It serves a variety of purposes, including a dedicated time for planning, retrospective, exploring and innovating C) It is the main way in SAFe for achieving relentless improvement D) It provides time to identify dependencies and issues that could impact the next iteration It provides time to identify dependencies and issues that could impact the next iteration What are two behaviors of an effective Scrum Master? (Choose two) A) To focus on their own objectives and limit interaction with Product Owner B) To work with stakeholders and subject matter experts to define the Epic and its potential benefits C) To act as a servant leader and exhibit Lean-Agile leadership D) To ensure no changes are made to the scope during an iteration E) To facilitate the teams progress toward the iteration goals To act as a servant leader and exhibit Lean-Agile leadership and to facilitate the teams progress towards the iteration What statement is true about features and stories? A) Features should be small enough to fit into an iteration B) Each feature should have at least five stories C) Features can be larger than an iteration but Stories should be small enough to fit into an iteration D) Stories can be broken into features Each feature should have at least five stories Which statement defines the purpose of Iteration Planning (IP)? A) It is to break stories into tasks that are achievable in the team's capacity B) It is to explore and implement program Epics and split them into Features to be further explored C) It is to organize the work and define a realistic scope for the iteration D) It is to analyze, approve, and ready Features for implementation It is to organize the work and define a realistic scope for the iteration What is the major benefit for reducing batch size? A) Increase throughput B) Decrease stress on the system C) Increase visibility D) Increase Work-In-Progress Increase throughput Develops and delivers solutions incrementally, using a series of fixed-length iterations within a Program Increment (PI) timebox and aligns teams to a common business and technology mission. Agile Release Train During the Inspect and Adapt event, how are reflection, data collection, problem solving, and identification of improvement actions used? A) To help the team bond and work more efficiently together B) To enhance and improve the innovation and planning processes C) To evalutate better implementation steps D) To increase the quality and reliability of the next PI What best supports Innovation in the Safe House of Lean? A) Visualizing work B) Optimizing the whole C) Fast Learning Cycles D) Built in Quality Visualizing the work Optimizing the whole (Relentless Improvement) Fast Learning Cycles (Iterations and Program Increments) Built in Quality (Flow) Which statement describes the information within a story? A) Story acceptance criteria must be finalized before beginning iteration planning B) A story is written in full detail specifications so that the work is ready to be implemented immediately C) No further conversation is required after the Story is identified because it contains all necessary details D) A story provides just enough information for the intent to be understood by both business and technical people A story provides just enough information for the intent to be understood by both business and technical people What statement is true about Iteration Goals? A) They are used to measure business value achieved for each iteration B) They align the team to a common vision of work in the iteration C) They are used to track scope changes over time D) They verify that teams are working at their full capacity They align the team to a common vision of work in the iteration What is the responsibility of the Scrum Master? A) To remove impediments in order to protect the team B) To facilitate Scrum of Scrum events C) To lead and coach those who support and facilitate the work of all Agile Release Trains and suppliers D) To develop and commit to Team PI Objectives and iteration plans To remove impediments in order to protect the team external forces According to the definition of Done, who must provide final approval prior to the release? A) The Release Management B) The Scrum Master C) The Release Train Engineer D) The Product Owner The Product Owner Which statement is true about the purpose of a Work-In-Process constraint? A) It identifies possible constraints for Solution completion B) It helps analyze, approve, and track Portfolio Epics and Enablers C) It captures where all new "big" ideas come from D) It encourages collaboration and enables flow The Scrum Master wants to establish a team's initial velocity. The team has two testers, three developers, one half-time Scrum Master, and a Product Owner split between two teams. What is their normalized velocity before calculating for time off? A) 52 B) 0 C) 32 D) 40 40 (5 * 8 = 40) What are the three "Cs" of a User Story? Card, Conversation, and Confirmation What are the five core competencies of the Lean Enterprise? Lean-Agile Leadership Team and Technical Agility DevOps and Release on Demand (Develop on cadence, release on demand) Business Solutions and Lean Systems Engineering Lean Portfolio Management Why do teams use Scrum and Kanban? Agility What does ART stand for? Agile Release Train What does DevOps provide? (Hint: CALMR) Culture Automation Lean-flow Measurement Recovery What does Lean Portfolio Management do? Connects the portfolio to the enterprise strategy Creates Lean budgets and investment guardrails (management reserve) Manages portfolio operations Provides Lean governance across value streams Who is the Father of Lean? Tachi Ono What is the roof on the SAFe House of Lean? Value What are the four pillars on the SAFe House of Lean? Respect for Culture and People Flow Innovation Relentless Improvement What is the foundation on the SAFe House of Lean? Leadership What are the key aspects of Flow in the SAFe House of Lean? Optimize continuous and sustainable throughput of value Avoid start-stop-start project delays Build quality in, flow depends on it Understand, exploit and manage variability Integrate frequently Informed Decision making via fast feedback Never work at 100% capacity What is Little's Law? Average wait time = average queue length/average processing rate The following are the responsibility of who? - Creates and refines user stories and acceptance criteria -Defines, builds, tests, delivers stories - Develops and commits Team PI Objectives and Iteration plans Development Team The following are the responsibility of who? - Defines and accepts stories - Acts as the customer for developer questions - Works with Product Management to plan Releases Product Owner The following are responsibilities of who? - Runs team meetings, coaches Agile mindset and practice - Removes impediments, protects the team from outside influence - Attends Scrum of Scrum meetings - Can be part time as a team member and can be shared across 2 - 3 teams Scrum Master The following are responsibilities of who? - Builds the development infrastructure and manages environments - Assist with test automation strategies and adoption - Provides and support full system integration - Performs end-to-end system and performance testing - Stages and supports the system demos System Team Which type of team would you use for: - Fastest velocity - To minimize dependencies - To develop T-shaped skills Feature Teams Which type of team would you use for: - High reuse, high technical specialization, and critical NFRs - Creating each component as a potentially replaceable part of the system, with well-defined interfaces Component Team Define this role: A member of the agile team, provides a single voice for the Customer and stakeholders, owns and manages the team backlog, defines and accepts requirements, makes the hard calls on scope and content Product Owner Where are features identified, prioritized, estimated and maintained? Program Backlog What is an NFR(s)? Non Functional Requirements What is INVEST? Attributes of a good user Story Independent Negotiable Valuable Estimable Small Testable Infrastructure, Architecture, Exploration, and Compliance are all types of what? Enabler Stories CONTINUED..


Información del documento

Subido en
3 de junio de 2024
Número de páginas
16
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Allan100
3.5
(92)
Vendido
649
Seguidores
606
Artículos
3196
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.