Advanced Rigging Test with 100% Solutions
Cribbing is used to - Support a load of the ground For some crane load charts, the greater the number of layers on the winch drum, the - Lower the line pull available to lift the load On some manufacturers' load/ capacity charts, the information set off in parentheses under the gross capacities is the - Boom angle The working load limit of a hoist rope is the diameter of the rope - Squared, then multiplied by 8 The device that greatly increases the crane's capacity through configuration changes and weight transfer is the - Ring attachment The personnel platform's rigging may only be used for the platform, employees, tools, and - Work materials For hoisting operations, the crane must be level within - 1% According to ASME, during proof testing, the platform and rigging are required to be loaded to - 125% of the platform's rated capacity According to OSHA requirements, lifelines must be secured above the point of operation to an anchorage or structural member capable of supporting a minimum dead weight of - 5,400 lbs. Under ASME guidelines, platforms must have a minimum platform rating of - 300 lbs. According to OSHA requirements, all eyes in wire rope slings must be fabricated with - Thimbles During proof testing, under both OSHA and ASME guidelines, the platform must be held in a suspended position for not less than - 5 minutes Under ASME guidelines, the access gate on a platform must be equipped with a - Positive-acting device to keep it from opening accidentally When a crane is operating, the minimum boom or mast clearance from a 750kv power line is - 45 feet
Información del documento
- Subido en
- 27 de mayo de 2024
- Número de páginas
- 7
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas