Construction Project Management UPDATED Test Questions and CORRECT Answers

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

ROWAcronym for Right of Way in traffic control General ConditionsInclude items not part of the final product, like tools and equipment Direct CostCost directly related to the work being done, like subcontractor services Labor BurdenCosts like workman's comp, bonuses, and holiday pay for employees Negative PressureAir pressure lower in construction zones compared to occupied areas General RequirementsProtocols for project administration FieldManual labor tasks not specified in work scope or general requirements

Vista previa del contenido

Construct ion Project Management UPDATED Test Questions and CORRECT Answers ROW✔✔✔ Acronym for Right of Way in traffic control General Conditions ✔✔✔ Include items not part of the final product, like tools and equipment Direct Cost ✔✔✔ Cost directly related to the work being done, like subcontractor services Labor Burden ✔✔✔ Costs like workman's comp, bonuses, and holiday pay for employees Negative Press ure✔✔✔ Air pressure lower in construction zones compared to occupied areas General Requirements ✔✔✔ Protocols for project administration Field✔✔✔ Manual labor tasks not specified in work scope or general requirements Administrative ✔✔✔ Non-manual tasks for pr oject management and administration Spec Book ✔✔✔ Contains required general condition items for a project Project Phasing ✔✔✔ Process of planning project stages and logistics Supervision ✔✔✔ Determining staff needs and costs for project phases Site Logistics Plan✔✔✔ Details work phases, logistics, and safety measures on a construction site Mobilization ✔✔✔ Moving equipment and manpower to a site for construction Logistics✔✔✔ Planning and control of resources to meet project goals Gross Profit ✔✔✔ Total profit before deducting expenses Net Profit ✔✔✔ Profit after deducting all expenses from revenue Concrete Placement ✔✔✔ Method using a concrete truck directly with the chute General Liability Insurance ✔✔✔ Protects against public injuries or property damage on the job Worker's Compensation Insurance ✔✔✔ Provides benefits for injuries by workers on the job Winter Conditions ✔✔✔ Considerations like heat loss and ground thaw units in construction SLP Safety Items ✔✔✔ Include fencing, fall protec tion, and signage for site safety SLP Site Challenges ✔✔✔ Issues like site levelness, runoff, and excavation access in logistics planning Bid Tabulation ✔✔✔ Process of calculating and listing all costs for a project bid Needle Beam ✔✔✔ Structural modification for installing new openings in masonry walls Direct Fired Heater ✔✔✔ Temporary heater introducing moisture into heated space Height of Crane ✔✔✔ Critical information for FAA review in a site logistics plan

Información del documento

Subido en
23 de mayo de 2024
Número de páginas
5
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Vendido
18
Seguidores
1
Artículos
4642
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes