• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 12 páginas
Examen

CUSP - T&D Questions & Answers | 150 Questions with 100% Correct Answers | Verified |

Document preview thumbnail
Vista previa 2 fuera de 12 páginas

CUSP - T&D Questions & Answers | 150 Questions with 100% Correct Answers | Verified |

Vista previa del contenido

CUSP - T&D Questions & Answers | 150 Questions with 100% Corre ct Answers | Verified | As per CAN/ULC S801, on an electrical distribution overhead utility li ne circuit, verification of voltage absence can be achieved by: - ANSWER✔✔ -Using an approved voltage detector. Isolation and tagging (no locks) is acceptable on an overhead distribution circuit under some of the following conditions, EXCEPT for: - ANSWER✔✔ -The isolation can be operated from the ground directly at the base of a structure. Isolation and tagging (no locks) is acceptable for an overhead distribution circuit under some of the following conditions: - ANSWER✔✔ -1. The isolation point is a physical and visual like a line cut or riser removed. 2. The isolation point can only be operated by the operating authority or qualified worker. 3. The isolation point is protected from unauthorized access such as vertical height spacing. Consider that a circuit has been isolated, tagged and grounded. workers returning the next day must: - ANSWER✔✔ -Visually check grounds to verify they are in good order, secure and test for voltage. For lockout purposes, energy isolating devices shall be labelled or marked using a standardized nomenclature and format to indicate their function. Identification shall include: - ANSWER✔✔ -The equipment type, energy type, and magnitude. Utilities often use a permitting system due to special circumstances of which conventional lockout is impracticable. The following is NOT a justified approach to this process: - ANSWER✔✔ -The isolation points are only simple single step actions. A high voltage utility or electrical company is authorized to use Complex Lockout (tag permitting) under what re gulatory condition: - ANSWER✔✔ -A variance application has been approved by the provincial authority. Utilities often use a permitting system due to special circumstances of which conventional lockout is impracticable. The following are justified approaches to this process: - ANSWER✔✔ -1. The isolation points are located in remote areas with difficult or restricted access. 2. The length of time to perform the lockout is impracticable. 3. Excessive numbers of persons required to lockout. Work on a distributio n line must consider the following items when performing isolation and de -
energizing of the circuit.: - ANSWER✔✔ -1. Whether there are multiple sources of energy (loop feed) on the circuit. 2. Is the line isolating device capable of interrupting load. 3. Is the line to be subject to inductive or capacitive charge. According to the CAN/ULC S801, what is the LEAST DESIRABLE type of fall protection: - ANSWER✔✔ -Fall Arrest System (FAS) Within Z259.14 standards fall restriction equipment (FRE) may only be leather in subcomponents or elements that are NOT exposed to: - ANSWER✔✔ -A dynamic load. As per Z259 standards, energy absorbing lanyards shall be classified according to their ability t o absorb the kinetic energy from a fall as follows: - ANSWER✔✔ -Class E4 (4.0 kN) and Class E6 (6.0 kN) energy absorbing lanyards. Assuming that the fall protection system is correctly being used, in what scenario might the worker still contact the ground i f they fell: - ANSWER✔✔ -Working 16 feet up in a bucket truck on distribution secondary services using a six foot shock absorbing lanyard, connected to the approved bucket anchor. What is NOT defined as a requirement of temporary vertical life lines as per Z259 standards: - ANSWER
✔✔ -100% polypropylene fibers provide the greatest breaking strength. Requirements of temporary vertical life lines, as per Z259 standards: - ANSWER✔✔ -1. Shall be made from synthetic fibers with breaking strength of 27 kN or greater. 2. They shall be free of splices and knots, except at the terminations. 3. They shall be installed to protect against abrasion and sharp edges. Working on an energized lattice tower requires emergency response consistent with the associated hazards. What is NOT required as part of the emergency planning: - ANSWER✔✔ -Daily practice of tower rescue method. Working on an energized lattice tower requires emergency response consistent with the associated hazards, including: - ANSWER✔✔ -1. A means to contact the o perating authority to de -energize the circuit. 2. Rescue equipment readily available to quickly and safely lower the worker. 3. Regular rescue practices on tower rescue at an appropriate frequency. Z259.14 wooden pole choker devices that are designed and tested to restrict a workers fall distance under dry, wet, and icy conditions are classified as: - ANSWER✔✔ -Type AB device. The voltage limits and mechanical strength of a live line tool is best specified by: - ANSWER✔✔ -The manufacturers requirements.

Información del documento

Subido en
15 de mayo de 2024
Número de páginas
12
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$17.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
2
Seguidores
1
Artículos
126
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes