Acq 101 Study Guide Test 2024.
ACQ 101 STUDY GUIDE TEST 2024. Major Capabilities Acquisition Pathway Structure - correct answer The structure of a DoD acquisition program and the procedures used should be tailored as much as possible to the characteristics of the product being acquired, and to the totality of circumstances associated with the program, including operational urgency and risk factors. Major Capabilities Acquisition Pathway Structure- Milestones - correct answer The Major Capability Acquisition pathway uses "milestones" to oversee and manage acquisition programs.At each milestone a program must meet specific statutory and regulatory requirements before the program can proceed to the next phase of the acquisition process.These are the three milestones: Milestone A: initiates Technology Maturation and Risk Reduction Milestone B: initiates Engineering and Manufacturing Development Milestone C: initiates Production and Deployment Major Capabilities Acquisition Pathway Structure- Phases - correct answer 5 phases- Material Solution Analysis Technology Maturation and Risk Reduction Engineering and Manufacturing Development Production and Development Operations and Support Major Capabilities Acquisition Pathway Structure- Decision Points - correct answer The Major Capability Acquisition pathway also consists of these four decision points: Materiel Development Decision (MDD) Capability Development Document Validation (CDD-V) Development Request for Proposal (RFP) Release Decision Full-Rate Production (FRP) Decision
Información del documento
- Subido en
- 3 de mayo de 2024
- Número de páginas
- 15
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas