• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Examen

Final Estimates Level 2 || With Error-Free Solutions.

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

On multi FIN project numbers under one contract, the Asphalt is reported on the certification, by the CONTRACTOR, under what Project FIN Number? correct answers The Contractor shows the Asphalt on the lead FIN project number A roadway is being constructed and has a Subsoil Excavation Quantity of 835 CY, a Regular Excavation Quantity of 250 CY and an embankment Quantity of 1040 CY. Based upon this information, the Final Quantity to be paid for embankment will be? correct answers 1875 CY Which Document is used to authorize payment from original contingency Amount? correct answers Work Order Friction Course (FC-12.5) Straight edge Deficiency: A straightedge deficiency was left in place at no pay. Calculate the equivalent tonnage at no pay. ( pay to appropriate accuracy) Gmm= 2.417, thickness =1.5 inches, road width =12 feet, length of deficiency = 5 ft. (this occurred 25 feet from the bridge deck) correct answers 8.4 Tons Overruns or Underruns must be explained when? correct answers A pay item overruns or underruns $10,000 or more. Prices are adjusted on each progress estimate to reflect increases or decreases in the price of fuel for contracts with original Contract Time: correct answers In excess of 120 calendar days. Which of the following is an authorized way to modify the contract, once it has been executed? correct answers Work Orders and Supplimental Agreements Of the Contract Documents listed below which one would govern? correct answers Special Provisions Why is it important to run a progress estimate soon after Final Acceptance? correct answers So the estimate can be paid through EED quickly to prevent interest. On Financial Project No., which is a conventional project, the notice to proceed is dated December 1, 2015 and the contract time is to start 16 days after the Notice to Proceed per the contract. The Contractor begins work on December 18, 2015 and the project is Final Accepted on December 31, 2015. There are no added weather or other reasons. What is the 1st chargeable day and how many total days should be recorded in the Contract Time File? correct answers 12/17/2015 with 15 chargeable days. On Lump Sum Contracts, upon Final Acceptance, the Project Administrator will send? correct answers The Offer of Final Payment


Información del documento

Subido en
2 de mayo de 2024
Número de páginas
6
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
SirAnton
3.7
(118)
Vendido
809
Seguidores
438
Artículos
40068
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.