Construction Estimating Midterm 2024 || With Error-Free Solutions.
Throughout the estimating process, __________ must make judgment calls regarding techniques, pricing, and people, and they often put their reputations on the line. correct answers estimators Often during construction operations the owner or the designer asks the contractor to quote prices for proposed __________ in the scope of work. correct answers changes Estimating is a distinct function in the __________ field and focuses on the costs of a construction project. correct answers construction management An ____________ in its essence is an assessment of the probable total cost of some future activity. correct answers estimate The __________ estimate is prepared from a minimum amount of information because it is required at a time when the project is often little more than a vague idea in the mind of the owner. There will be few if any design details at this stage because the design process will not begin until the owner is satisfied that the cost of proceeding with it is justified. correct answers conceptual Once the __________ turns the project over to the project manager and the on-site team, the estimator shifts to a support role and really has no direct management duties associated with the day-to-day operations. (select the best answer) correct answers estimator Cost budgets are compiled in a ___________ that is a summary of all anticipated project expenditures. The budget amounts contained in the ___________ are verified from time to time during the design phase using more accurate estimating methods based on the specific design details that emerge in this phase of the project. (Select one answer for both blanks) correct answers cost plan Every time contractors estimate a job and submit a bid, they are taking a__________. correct answers risk ___________ time is the amount of time it takes for a product or equipment to be delivered to the job site. Products that have a long delivery time are called long __________-time items and require special planning considerations. (select the best answer that applies to both blanks) correct answers lead When the design is completed, a final __________ estimate can be compiled to anticipate the contractor's bid price for the work. correct answers pre-bid The quality of the project is defined by the standards set forth in the __________. correct answers specifications
Información del documento
- Subido en
- 27 de abril de 2024
- Número de páginas
- 29
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas