• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 1 fuera de 2 páginas
Ensayo

Part D - Assignment 3 (Unit 9: IT Project Management) (Distinction Achieved)

Document preview thumbnail
Vista previa 1 fuera de 2 páginas

This essay meets all of the criteria and achieved a distinction grade. To successfully fulfill this assignment, I recommend avoid direct replication of the provided content due to a chance of plagiarism. Instead, draw inspiration from the structure and concepts utilized to meet the specified criteria. Following Aims met in Assignment 3: - Learning Aim D: Undertake the closure of a project by reflecting on the success of personal performance and the project outcome Feel free to message for any questions. Part D - Assignment 3 (Unit 9: IT Project Management) (Distinction Achieved)

Vista previa del contenido

Unit 9 – Assignment D

How did the project go?

Introduction

In this report, I will analyse the project management skills and behaviours that I
applied to my first project development of a scoring system for our client. I will
reflect on my experience and make recommendations for improving my project
management skills and behaviours for the future.

Project Background

The goal of the project was to develop a scoring system for an annual sporting
tournament, where students would compete in a series of events for prizes as a
result a suitable system would need to be created. The project team consisted of
me as the Junior Project Manager, and two developers.

Project Management Skills Applied

Throughout the project, I utilized several project management skills and
behaviours that helped ensure the project’s success. These skills and behaviours
included:

1. Communication: One of the essential skills was effective communication
with the client. Since I chose the waterfall methodology this meant that us
and the client would only communicate during the first stage
(Requirements gathering), as a result it was key for me to get as much
information out of the client so I could then create and effective project
plan that contained objectives, goals, budget, time plans, resource plans,
risk management plans and quality assurance plans. This leads to my next
skill that ensured the project’s success. However I want to add on that I
made sure to have constant meetings after each critical task to ensure
that all team members were on the same page and if there was any
setbacks/issues that I would have to be notified about, so I can look at the
contingency/risk plans we have set in place. Overall, I believe I
demonstrated effective communication between the client and the team
to ensure the project was on track as much as possible.

2. Planning and scheduling: Another essential skill was planning. I believed
that this was the most important part of the project due to the way the
Waterfall methodology worked. If I didn’t have an effective and strong plan
the project would fail.

3. Risk Management: Risk Management was crucial to the project’s success.
As identifying potential risks and issues before the project started meant

Información del documento

Nivel de Estudio
Tema
Subido en
24 de abril de 2024
Número de páginas
2
Escrito en
2023/2024
Tipo
Ensayo
Profesor(es)
Desconocido
Grado
A+
$6.19

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Alex567
3.8
(8)
Vendido
29
Seguidores
8
Artículos
6
Última venta
4 semanas hace


Reseñas de compradores verificados




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes