Smartsheet Core Product Exam with Complete Solutions Graded A+
Smartsheet Core Product Exam with Complete Solutions Graded A+ What can you customize when you insert a hyperlink in a cell? - Answer-Display text Which takes priority when a sheet has 2 conditional formatting rules? - Answer-The rule on the top Which type of user can create or own a sheet in Smartsheet? - Answer-Licensed What permission is required to hide and unhide columns? - Answer-Admin Vivian uses a sheet to track the status of a project that she is managing. Several cells are cell linked to a sheet that the IT director uses to track all IT projects. Vivian updates her sheet. When do the linked cells on the director's sheet update? - Answer-When Vivian's sheet is saved Which column type tracks when a row was added to a sheet? - Answer-Created (Date) column Which are the 3 column types that can enable Card View? - Answer-Contact List, Dropdown (Single Select), Symbol Tyrone created a project plan sheet and is adding tasks. He added the first task, then moved to the next row to add his second task. What will automatically be copied down to the new row? - Answer-Formatting Which view must include 2 date columns in order to be displayed? - Answer-Gantt
Información del documento
- Subido en
- 16 de abril de 2024
- Número de páginas
- 8
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas