100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Otro

INF3708 Assignment 1 2024 solution

Puntuación
-
Vendido
3
Páginas
46
Subido en
06-04-2024
Escrito en
2023/2024

INF3708 Assignment 1 2024 solution

Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
6 de abril de 2024
Número de páginas
46
Escrito en
2023/2024
Tipo
Otro
Personaje
Desconocido

Temas

Vista previa del contenido

UNISA  2024  INF3708-24-Y  This is INF3708!  Assessment 1

QUIZ




Started on Wednesday, 3 April 2024, 7:18 PM
State Finished
Completed on Saturday, 6 April 2024, 6:42 PM
Time taken 2 days 23 hours
Marks 167.00/183.00
Grade 91.26 out of 100.00


Question 1
Correct

Mark 1.00 out of 1.00




Which approach for constructing a WBS uses a similar project’s WBS as a starting point?


a. mind-mapping
b. bottom-up
c. top-down
d. analogy 




Question 2
Correct

Mark 1.00 out of 1.00




The table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed
is referred to as _______.


a. Gantt chart
b. requirements traceability matrix 
c. state transition table
d. entity-attribute-value model




Question 3
Correct

Mark 1.00 out of 1.00




Which project management knowledge area ensures that the project will satisfy the stated or implied needs for which it was
undertaken?


a. Project time management
b. Project risk management
c. Project quality management 
d. Project cost management

,Question 4

Correct

Mark 1.00 out of 1.00




The organization recognizes that a new project exists and completes a project charter during which processes for a new
project?


a. opening
b. initiating 
c. planning
d. controlling




Question 5
Correct

Mark 1.00 out of 1.00




In project schedule management, what is the next step after defining project activities?


a. planning schedule management
b. controlling the schedule
c. determining their dependencies 
d. estimating activity duration




Question 6
Correct

Mark 1.00 out of 1.00




What document used to coordinate all project planning documents and help guide a project’s execution and control?


a. project management plan 
b. statement of work
c. scope statement
d. business case




Question 7
Correct

Mark 1.00 out of 1.00




Which statement best describes scope?


a. work involved in creating the products and the processes used to create them 
b. each level of work that is outlined in a work breakdown structure
c. end product created as part of a project that is delivered to the client
d. tasks that are decomposed into smaller tasks in a work breakdown structure

,Question 8

Correct

Mark 1.00 out of 1.00




According to Thamhain and Wilemon, what is the ability to improve a worker’s position?


a. penalty
b. promotion 
c. assignment
d. expertise




Question 9
Correct

Mark 1.00 out of 1.00




What are the bottom four needs in Maslow’s structure are referred to as?


a. self-actualization
b. deficiency 
c. safety
d. growth




Question 10
Correct

Mark 1.00 out of 1.00




Which software development approach allows developers to use a model to generate functional requirement and physical
design specifications concurrently?


a. Prototyping approach 
b. incremental approach
c. RAD approach
d. Waterfall approach




Question 11
Correct

Mark 1.00 out of 1.00




The main outputs of which process are team performance assessments, change requests, and updates to several
documents?


a. managing the project team
b. acquiring the project team
c. human resource planning
d. developing the project team 

, Question 12

Correct

Mark 1.00 out of 1.00




Which technique is used for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for
the least incremental cost?


a. crashing 
b. dependency
c. feeding buffers
d. breakdown structure




Question 13
Correct

Mark 1.00 out of 1.00




You work for a project team which decides not to us an upcoming release of software because it might cause your schedule
to slip. Which risk response strategy are you using?


a. acceptance
b. transference
c. avoidance 
d. mitigation




Question 14
Correct

Mark 1.00 out of 1.00




Which process involves prioritizing risks based on their probability and impact of occurrence?


a. planning risk responses
b. identifying risks
c. performing quantitative risk analysis
d. performing qualitative risk analysis 




Question 15

Correct

Mark 1.00 out of 1.00




Business case are developed at which software project management activity of?


a. Project design
b. Feasibility study 
c. Project execution
d. Planning
$7.50
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
foxNotes Acsess Business Academy
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
112
Miembro desde
2 año
Número de seguidores
63
Documentos
35
Última venta
1 mes hace
saveNotes

5.0

5 reseñas

5
5
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes