Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 13 páginas
Examen

Naslca Virginia Exam Practice Best Graded Questions and Answers

Document preview thumbnail
Vista previa 2 fuera de 13 páginas

All Class A contractor licensure applications MUST include - ANSWER-information on the knowledge, skills, and abilities of the applicant. What is the PRIMARY purpose of licensing? - ANSWER-Protect the health and welfare of the public. When a claimant is paid funds from the Contractors Recovery Trust Fund - ANSWER-the contractor's license is revoked. !!! The application for licensure MUST include - ANSWER-the business address of the proposed designated employee. Which of the following is a requirement for a joint venture? - ANSWER-Either the joint venture or each contracting party of the joint venture must be licensed. All of the following must be licensed EXCEPT - ANSWER-a material supplier who advises a contractor. How much is the Class A initial license fee? - ANSWER-$200 A licensee's name change MUST be reported to the Board within a MAXIMUM of how many days? - ANSWER-30 days According to the Board Rules and Regulations, a full-time employee is one who works a MINIMUM of how many hours per week? - ANSWER-30 hours. A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net worth of - ANSWER-$15,000. According to the Board Rules and Regulations, which of the following could be a qualified individual? - ANSWER-Any full-time employee. An appeal of the local building official's decision to refuse to grant a modification to the USBC MUST be made to the local building board within a MAXIMUM of how many days? - ANSWER-90 days. A building official MUST issue a certificate of occupancy for a building that meets all the requirements for a certificate within a MAXIMUM of how many working days after the certificate was requested? - ANSWER-5

Vista previa del contenido

Naslca Virginia Exam Practice Best
Graded Questions and Answers
What is the MAXIMUM penalty for a contractor who undertakes work without the
proper class of license? - ANSWER-$500 fine per day for each day of violation plus
penalties for a misdemeanor.

All Class A contractor licensure applications MUST include - ANSWER-information
on the knowledge, skills, and abilities of the applicant.

What is the PRIMARY purpose of licensing? - ANSWER-Protect the health and
welfare of the public.

When a claimant is paid funds from the Contractors Recovery Trust Fund -
ANSWER-the contractor's license is revoked. !!!

The application for licensure MUST include - ANSWER-the business address of the
proposed designated employee.

Which of the following is a requirement for a joint venture? - ANSWER-Either the
joint venture or each contracting party of the joint venture must be licensed.

All of the following must be licensed EXCEPT - ANSWER-a material supplier who
advises a contractor.

How much is the Class A initial license fee? - ANSWER-$200

A licensee's name change MUST be reported to the Board within a MAXIMUM of
how many days? - ANSWER-30 days

According to the Board Rules and Regulations, a full-time employee is one who
works a MINIMUM of how many hours per week? - ANSWER-30 hours.

A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net
worth of - ANSWER-$15,000.

According to the Board Rules and Regulations, which of the following could be a
qualified individual? - ANSWER-Any full-time employee.

An appeal of the local building official's decision to refuse to grant a modification to
the USBC MUST be made to the local building board within a MAXIMUM of how
many days? - ANSWER-90 days.

A building official MUST issue a certificate of occupancy for a building that meets all
the requirements for a certificate within a MAXIMUM of how many working days after
the certificate was requested? - ANSWER-5

, Additions to buildings MUST comply with - ANSWER-the current code for new
construction.

When MUST the work be stopped following the issuance of a stop work order? -
ANSWER-Immediately

Who is to be in charge of a local building department? - ANSWER-Building official.

Contractors who are assessed a fee to support the Transaction Recovery Fund
MUST pay this fee within a MINIMUM of how many days from when the assessment
fee notice was mailed? - ANSWER-45 days

Contractors will be assessed a fee for the Transaction Recovery Fund whenever the
fund balance is less than - ANSWER-$400,000.

Payments made by the Transaction Recovery Fund to claimants may include an
amount for - ANSWER-attorneys' fees.

A contract for which of the following types of structures may be subject to recovery
from the Transaction Recovery Fund? - ANSWER-Residential only.

A verified claim for payment from the Transaction Recovery Fund MUST occur within
a MAXIMUM of what period of time from the date the claimant was awarded a final
judgment? - ANSWER-12 months.

An appeal of a final decision of a county on an erosion control plan MUST be filed
within a MAXIMUM of how many days? - ANSWER-30 days.

Temporary erosion and sediment control measures MUST be removed within a
MAXIMUM of how many days after the final site stabilization? - ANSWER-30 days.

Which of the following statements about a sole proprietorship is TRUE? - ANSWER-
The business, or any part of it, can be sold, altered, or exchanged at will.

What type of business organization allows people to share financial resources? -
ANSWER-Partnership.

Which of the following estimating methods is typically used by the architect rather
than the contractor? - ANSWER-Conceptual estimate.

Equipment needs for a project are BEST estimated by - ANSWER-calculating the
number of hours or days it is needed.

What should be added to wage rates to ensure accuracy in estimating labor for a
project? - ANSWER-Labor burden.

A reason for using a lower than usual profit markup for a specific project could be to -
ANSWER-cover company overhead costs.

Información del documento

Subido en
4 de abril de 2024
Número de páginas
13
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$10.69

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
IMORA
4.4
(70)
Vendido
215
Seguidores
77
Artículos
5091
Última venta
1 semana hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes