ARE 366 Updated Exam Questions and CORRECT Answers
Contract Modification Modification of existing contract clause or detail Contract change Differing contract inclusion that has not yet been accepted by one or both parties Canons of contract interpretation 1. Handwritten is more powerful than print 2. Specific is more powerful than general 3. ----------------------------------------- Spearin Doctrine - Favors Contractors 1. Contractor should worry about following instructions, bot analyzing drawings/specs 2. Contractors are not liable for design defects if all plans/specs are followed exactly as recieved
Información del documento
- Subido en
- 27 de marzo de 2024
- Número de páginas
- 10
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas