ATS Study Guide Solved 100%
ISIC - Answer Immidiate Superior in Command FRTP - Answer Fleet Response Training Plan NMETL - Answer Navy Mission Essential Task List READY-Eee - Answer Readiness Evaluation TSRA - Answer Total Ship Readiness Assessment TFOM - Answer Training Figure of Merit MITE - Answer Monthly In-Port Training Exercise TFOM - Answer Training Figure of Merit LOA - Answer Light Off Assessment SORTS - Answer Status of Resources and Training System FLTMPS - Answer Fleet Training Management Planning System. Used to document and track personnel shortfalls including critical NEC and schools deficiencies. NCTE - Answer Navy Continuous Training Environment ITT - Answer Integrated Training Team CSTT - Answer Combat System Training Team DCTT - Answer Damage Control Training Team ETT - Answer Engineering Training Team MTT - Answer Medical Training Team STT - Answer Seamanship Training Team ATTT - Answer Force Protection Training Team What is contained in FRTP Phase - Answer Sustainment Maintenance Shakedown Basic Integrated Integrated and Advance Sustainment - Answer Ship/Unit will maintain the level of certification until the end of FRTP Maintenance - Answer Ships focus on building the foundation individual watch team and school house training to build foundation for unit level readiness Shake Down - Answer Verifies the ships material conditions supports basic phase training, and ensures that all systems, meet established material conditions standards Basic - Answer Focus on completion of TYCOM unit level training requirements, which include adherence to material standards, watch stations and watch team training, unit level exercise at port and at sea. TYCOM CERTIFIES THAT THE SHIP HAS COMPLETED THE BASIC PHASE Advance/Integrated - Answer Advance exercise are accomplished during this phase. Discuss the two parts of basic phase - Answer Mobility (Tier 1) Unit Tactical (Tier 2) Discuss the Unit Warfare Training Completed During Tier 2 - Answer AW-Air Warefare AMW- BMD- SUW USW IO INT VBSS Discuss the purpose of a light off assessment and when is it conducted - Answer To ensure ships is cable of safely lighting off and operating its engineering plant prior to going to sea when exiting a CNO availability or any significant maintenance period (120 days or greater in length) or when they TYCOM deems it necessary Discuss the TSRA Total Ships Readiness Assesments - Answer Material assessments package coordinated by the regional maintenance center designed to improve maintenance project management, repair equipment, support system light-off, and provide over-the-shoulder training to ships force maintenance personnel Discuss Fleet Response Training Plan - Answer Notionally 27 month, the FRTP is aligned with the fleet response plan and consist of 5 phase Discuss the two fundamental milestones required by ships to progress through the FRP - Answer Basic Phase Completion Deployment Certification
Escuela, estudio y materia
- Institución
- ATS
- Grado
- ATS
Información del documento
- Subido en
- 21 de marzo de 2024
- Número de páginas
- 11
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
ats study guide stuvia
-
ats study guide solved 100
-
isic immidiate superior in command
-
frtp fleet response training plan
-
nmetl navy mission essential task list
Documento también disponible en un lote