• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 14 páginas
Examen

Prestressed Concrete Questions with 100% complete and Correct Answers |A+ Grade

Document preview thumbnail
Vista previa 2 fuera de 14 páginas

Prestressed Concrete Questions with 100% complete and Correct Answers |A+ Grade Prestressed Concrete Questions with 100% complete and Correct Answers |A+ Grade Prestressed Concrete Questions with 100% complete and Correct Answers |A+ Grade

Vista previa del contenido

Prestressed Concrete Questions with 100%
complete and Correct Answers |A+ Grade
What is prestressed concrete - Answer- The tensioning of steel - stranded cables
prior to concrete placement.

The tensioning of steel- stranded cables after concrete has been placed and
hardened.

Concrete that has received a tensile load prior to any service loads.



The use of a prestressed concrete system will achieve the following

- Answer- Reduced thickness of concrete, less traditional reinforcing steel, and
adequate crack control



Once tensioned, Tensioning cables are held securely in a tensioned state by -
Answer- wedges that have been seated



The end of a cable that terminates within a concrete slab, thus rendering it
inaccessible from outside the concrete is known as - Answer- the dead end



The presence of sheathing on a wire-stranded cable indicates that - Answer- it will
be used in an unbonded system application



The most common post-tension cable tendons in use today are made up of -
Answer- steel strands of wire wrapped together

, Prestressed Concrete Questions with 100%
complete and Correct Answers |A+ Grade
In a unbonded system, the force applied to the concrete after tensioning -
Answer- comes from the anchorage zone only



Post-tension manufacturing plants must be certified by - Answer- PTI unbonded
plant certification program



Prior to cutting the tendon tails after tensioning, the field records of stressing
activities must be forwarded to and approved by - Answer- the engineer of record



In the event that a new set of stressing equipment is delivered to project, the
equipment should contain___ for review prior to being used on-site

- Answer- a current calibration chart relating gauge pressure to force applied



According to the field procedures manual for unbonded single strand tendons,all
of the following items are necessary for post- tension document control except

- Answer- concrete strength results



When reporting stressing results,the following information is necessary to record
- Answer- Jack and gauge serial #

&

elongation measurements and percentage deviation



When moving post-tension cables across the site, the use of __ is permitted

Información del documento

Subido en
21 de marzo de 2024
Número de páginas
14
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$9.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Joealvin
5.0
(1)
Vendido
4
Seguidores
2
Artículos
377
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes