ProPrac Test 2
ProPrac Test 2 In which project specification division would you expect to find windows: - 08 In which project specification division would you expect to find structural steel: - 05 The Architect's responsibility in review of a submittal provides for the following: - Limited checking for conformance with the contract documents Which is not a responsibility of the architect during the Construction phase: - Establish means and methods In which phase does the design team work out clear, coordinated description of the design including fully developed floor plans, sections, exterior elevations, wall sections and key details but not final details or comprehensive interior elevations: - Design Development Specifying end results that allow flexibility and creativity to meet requirements instead of describing exact characteristics or specific named products is known as: - Performance Specifying The specification 00 section that establishes a consistent understanding of the procedures that bidders should follow in preparing their bids such as consideration of bids is: - Instruction to Bidders The right for the owner to reject any or all bids is typically included in the bidding documents: - True The contractor determines the date of Substantial Completion: - False Who typically provides project record documents during project close‐out: - Contractor The variation of Design-build common in Europe and Japan where an owner contracts with an architect for schematic design and technical review during design and construction before handing the project over at design development to a design-build entity is known as: - Bridging According to the textbook author Paul Segal, FAIA, on the majority projects, who is the most effective Project Manager: - Architect According to a survey of construction project owners, approximately what proportion of projects fail to meet either budget, schedule or both: - 1/3 Which are TRUE statements of Integrated Project Delivery (IPD): - 1) Professional Liability Insurance companies have problems underwriting IPD project delivery methods 2) IPD cannot work without a committed owner who must have knowledge of the industry Which of the following are examples of Unqualified Language that potentially alters the standard that the architect is held to: - 1) The masonry walls have been completed 2) 100% complete Construction Documents In which of these project delivery methods does the architect usually complete their construction documents prior to the construction contractors being determined: - Design-Bid-Build Which of the following is not a fundamental principal of Integrated Project Delivery (IPD): - Architect design control According to the McGraw Hill, the top cause of disputes on infrastructure projects is: - Changes in the scope of work Which item(s) impact the cost of professional liability insurance premiums: - 1) Billing volume 2) Project type 3) Geographic location 4) Coverage limits If total overhead is $341,000 and direct labor expense is $218,000, your break even multiplier is: - 2.56 Using less traditional procurement methods such as construction managers, multiple primes and fast-track or phased construction: - 1) Often results in increased
Información del documento
- Subido en
- 21 de marzo de 2024
- Número de páginas
- 14
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas