• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 14 páginas
Examen

ProPrac Test 2

Document preview thumbnail
Vista previa 2 fuera de 14 páginas

ProPrac Test 2 In which project specification division would you expect to find windows: - 08 In which project specification division would you expect to find structural steel: - 05 The Architect's responsibility in review of a submittal provides for the following: - Limited checking for conformance with the contract documents Which is not a responsibility of the architect during the Construction phase: - Establish means and methods In which phase does the design team work out clear, coordinated description of the design including fully developed floor plans, sections, exterior elevations, wall sections and key details but not final details or comprehensive interior elevations: - Design Development Specifying end results that allow flexibility and creativity to meet requirements instead of describing exact characteristics or specific named products is known as: - Performance Specifying The specification 00 section that establishes a consistent understanding of the procedures that bidders should follow in preparing their bids such as consideration of bids is: - Instruction to Bidders The right for the owner to reject any or all bids is typically included in the bidding documents: - True The contractor determines the date of Substantial Completion: - False Who typically provides project record documents during project close‐out: - Contractor The variation of Design-build common in Europe and Japan where an owner contracts with an architect for schematic design and technical review during design and construction before handing the project over at design development to a design-build entity is known as: - Bridging According to the textbook author Paul Segal, FAIA, on the majority projects, who is the most effective Project Manager: - Architect According to a survey of construction project owners, approximately what proportion of projects fail to meet either budget, schedule or both: - 1/3 Which are TRUE statements of Integrated Project Delivery (IPD): - 1) Professional Liability Insurance companies have problems underwriting IPD project delivery methods 2) IPD cannot work without a committed owner who must have knowledge of the industry Which of the following are examples of Unqualified Language that potentially alters the standard that the architect is held to: - 1) The masonry walls have been completed 2) 100% complete Construction Documents In which of these project delivery methods does the architect usually complete their construction documents prior to the construction contractors being determined: - Design-Bid-Build Which of the following is not a fundamental principal of Integrated Project Delivery (IPD): - Architect design control According to the McGraw Hill, the top cause of disputes on infrastructure projects is: - Changes in the scope of work Which item(s) impact the cost of professional liability insurance premiums: - 1) Billing volume 2) Project type 3) Geographic location 4) Coverage limits If total overhead is $341,000 and direct labor expense is $218,000, your break even multiplier is: - 2.56 Using less traditional procurement methods such as construction managers, multiple primes and fast-track or phased construction: - 1) Often results in increased


Información del documento

Subido en
21 de marzo de 2024
Número de páginas
14
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ExcellentScores
3.8
(76)
Vendido
306
Seguidores
227
Artículos
4200
Última venta
2 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.