Codewest Test -API 650 & 653 Questions only Rated A+
Codewest Test -API 650 & 653 Questions only Rated A+ The measurements for internal bottom settlement shall have a maximum of _______ feet spacing between elevation points across the diameter? 10 completed welds of stress relieved assemblies shall be examined by ____ ,after stress relieving, but before hydrotest MT or PT vertical shell joints for new replacement shell plates to existing shell plates or repaired joints in the existing shell plates shall have ____ additional radiograph (s) taken in each joint 1 the name plate for a reconstructed tank shell have: design conditions listed the Min. length of readable RT film according to API 653 is? 6" when the corrosion rate of a tank is known the interval between taking UT thickness measurements shall be the smaller of RCA/2N or 15 years if the corrosion rate is not known , what is the in-service UT interval ? general inspection reports shall include 5 years metal thicknes measurements, conditions found, repairs,any settlement measurements,and recommendations peaking shall not exceed 1/2" when measured with : to the true outside radius of the tank routine in service inspection includes : a horizontal sweep board 36" long and made visually checking the exterior tank's surface for leaks ,shell distortions,signs of settlement,signs of corrosion, condition of the foundation,condition of the paint, condition of the insulation system,and condition of appurtenances. which of the following is a major alternation ? addition of a 14" diameter nozzle corroded roof plates shall be repair or replaced,when their: average thickness is less than 0.09 in square inch area Hydrostatic test stress for a new tank is based upon: min tensile stress of the tanks material of construction the lesser of 3/4 the yield stress or 3/7 the If the number of elevation measurement points is determined by N= D/10, how many measurement points are necessary on a 50 feet diameter tank? 8 The joint between the new material of an insert plate and the old material of the existing tank shell plate shall be: butt welded. It has been determined that L=32" in a corroded area of a tank 125' in diameter and 40' high. Sixteen UT readings are taken every 2" over the length "L". The readings are as follows:0.42,0.32,0.38,0.30,0.28,0.25,0.26,0.25,0.23,0.29,0.26,0.31,0.37,0.34,0.33,and 0.39. Determine t1 (tavg). Round to the nearest hundredth. 0.31" The critical zone for repairs to tank bottoms, is that portion of the bottom or annular plate that is within ________ of the inside edge of the shell, measured radially inward. 3 inches
Información del documento
- Subido en
- 12 de marzo de 2024
- Número de páginas
- 2
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas