• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 29 páginas
Examen

CDFM Module 4

Document preview thumbnail
Vista previa 3 fuera de 29 páginas

CDFM Module 4 What are Joint Acquisition Programs? - Joint Acquisition Programs is any acqusition system, subsystem, component, or technology program with astrategy that includes funding by more than one DoD component during any phase of a system's life cycle. Who decides to place programs under joint acquisition management? - The MDA decides whether to place programs under joint management and designates the lead executive DoD component. What law requires an analysis of potential opportunities of international cooperation? - 10 USC 2350a(e) requires international cooperation consideration in the initial aquisition strategy for a program. When international programs may be established in the defense acqusition program - Decision to include international partners needs to be included during development of the initial capabilities document but no early than the material and solution analysis phase. When is Earned Value Management (EVM) implemented - EVM is part of program management . It ensures that cost , schedule and technical aspects of the contract are truly integrated. In what type of contracts EVM is required - EVM is required on Cost, and/or Incentive contracts valued at greater than $20M. What is EVM? - Earned Value Management is a tool that 1. Relates the scope of the work to its associated budgets and schedule. 2. Measures the work progress in objective terms 3. States that value of the work completed in dollars and other measurable units. What are EVM techniques? - Correlate the budgeted cost of worked scheduled with the budget cost of work performed (BCWP) 1. 0/100 Earned Value Technique 2. Percent Start/Percent Finish EV Technique (50/50) (25/75) (80/20) 3. Percent Complete 4. Units Completed 5. Equivalent Units Describe the Percent Start/Percent Finish EV Technique - Is an objective earned value technique tied to the start and completion of a work package task, often referred to % assigned to the start and finish milestone such as (50/50...) Thsi technique tends to overstate performance in the first half of the period of performance and uderstate performance in the last half. What is the most important step in EVM system? - Is the establishment of the Performance Measurement Baseline (PMB)or the Budgeted Cost of Work Schedule (BCWS) What is the PMB in and EVM? - The PMB includes the undistributed budget, all summary level planning package budgets, and all control account budgets. It does not include management reserve. What is the final step of the PMB? - Is to classify work, to allocate the budget and to time phase the control account work package


Información del documento

Subido en
10 de marzo de 2024
Número de páginas
29
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ExcellentScores
3.8
(76)
Vendido
306
Seguidores
227
Artículos
4200
Última venta
2 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.