Preliminary Project Description PPD - ️️describes the scope and relationships of major elements organized in terms of building systems and components - CSI recommends UniFormat for PPDS - describes as a system of components Outline specifications - ️️an abbreviated set of specification requirements normally included with schematic design or design development documents. Bassi for revising estimates of cost/schedule value - Record decisions shop drawing - ️️not a contract document - repared by contractor / sub/equipment supplier and show how an aspect of the work is to be fabricated and installed methods of specifying - ️️Descriptive, performance, reference standards, proprietary Descriptive Specification - ️️detailed description of required properties of product. A/E responsible for determination of desired performance criteria Performance Specifications - ️️required result with criteria for verifying compliance Proprietary specifications - ️️identify the desired manufacture or unique characteristic closed vs open proprietary specification - ️️ Two types of bonds - ️️performance bond and payment bond When are bonds expected to be delievered? - ️️To the owner when the contractor delivers the executed owner-contractor agreements
Información del documento
- Subido en
- 2 de marzo de 2024
- Número de páginas
- 20
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas