ARE 5.0 Project Management questions and answers well illustrated.
Project Management - correct answer-Includes project planning, scheduling, monitoring, coordinating and directing, updating documentation, closing out the job, and following up with clients. Partnering - correct answer-Various stakeholders in a project (such as the architect, owner, contractor and vendors) all participate in the decision-making process. Bar Chart - correct answer-Method commonly used for scheduling design and construction projects. Tasks are listed in chronological order on vertical access and time period is listed on horizontal axis. (Aka Gantt Chart) Dependency - correct answer-The relationship between a task that must be completed before another can start. Critical Path Method (CPM) - correct answer-Common scheduling tool that graphically depicts all the tasks needed to complete a project, the sequence in which tasks must occur, and each task's duration. Float - correct answer-The maximum length of time a noncritical task can be delayed or extended before it causes a delay. Work Plan - correct answer-A detailed project schedule, breaking the project down into its component tasks and assigning staff members and other resources to each task. (Aka Fee projection) Pro Forma - correct answer-Statement listing the expected income that the project will generate and the expected costs to build the project.
Información del documento
- Subido en
- 29 de febrero de 2024
- Número de páginas
- 20
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas