UST Dates and Frequency (100% Accurate)
Secondary containment required for all new USTs (date) correct answers January 1, 1984 (25291; H&SC) 23 CCR closure requirements do not apply to UST closed prior to ____________________ (date) correct answers January 1, 1984 (2670(I); CCR) New UST with pressured piping must have secondary containment after __________________(date) correct answers July 1, 1987 (25291; H&SC) Spill Containment required for all USTs (date) correct answers December 22, 1998 (2665; CCR) Overfill protection required for all USTs (date) correct answers December 22, 1998 (2665; CCR) Secondary Containment required for all non-motor vehicle fuel USTs (date) correct answers December 22, 1998 (2662 (b); CCR) Striker Plates required (date) correct answers December 22, 1998 (2662; CCR) Single wall steel USTs required cathodic protection & lining or bladder (date) correct answers December 22, 1998 (2662 (c); CCR) Shut down and fail safe LLDs required for single wall pressurized piping (date) correct answers December 22, 1998 (2666 (c); CCR) Under Dispenser Containment (UDC) required for newly installed USTs (date) correct answers January 1, 2000
Escuela, estudio y materia
- Institución
- UST Dates and Frequency
- Grado
- UST Dates and Frequency
Información del documento
- Subido en
- 14 de enero de 2024
- Número de páginas
- 6
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
secondary containment required for all new usts d
Documento también disponible en un lote