ACI Concrete Strength Testing Technician CP-19 (14) 80 Questions with 100% Correct Answers | Verified | Latest Update 2024
These procedures for capping enable concrete cylinders and cores to meet the standard's requirements for ________ and _________. - Planeness, perpendicularity Equipment needed for the capping process includes capping _____ , _____devices, and ______ pots. - Plates, alignment, melting Plates for neat cement and high strength gypsum plaster caps should be made of _____, _____, _____ or _____. - Glass, metal granite or diabase Sulfur mortar cap plates should be formed against _____ or _____ plates. - Metal, Stone The purpose of the guide bar or bull's eye level is to ensure that caps remain perpendicular to the axis of the cylinder within 0.5 degrees. True or False? - True To avoid accidents during reheating of cooled sulfur, use melting pots that have _____. - Peripheral heating The technician should use a stiff layer of _____ to cap fresh concrete cylinders. - Neat cement paste
Información del documento
- Subido en
- 10 de enero de 2024
- Número de páginas
- 9
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas