• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 7 páginas
Examen

UST Dates and Frequency Questions and Answers(A+ Solution guide)

Document preview thumbnail
Vista previa 2 fuera de 7 páginas

Secondary containment required for all new USTs (date) - January 1, 1984 (25291; H&SC) 23 CCR closure requirements do not apply to UST closed prior to ____________________ (date) - January 1, 1984 (2670(I); CCR) New UST with pressured piping must have secondary containment after __________________(date) - July 1, 1987 (25291; H&SC) Spill Containment required for all USTs (date) - December 22, 1998 (2665; CCR) Overfill protection required for all USTs (date) - December 22, 1998 (2665; CCR) Secondary Containment required for all non-motor vehicle fuel USTs (date) - December 22, 1998 (2662 (b); CCR) Striker Plates required (date) - December 22, 1998(2662; CCR) Single wall steel USTs required cathodic protection & lining or bladder (date) - December 22, 1998 (2662 (c); CCR) Shut down and fail safe LLDs required for single wall pressurized piping (date) - December 22, 1998 (2666 (c); CCR) Under Dispenser Containment (UDC) required for newly installed USTs (date) - January 1, 2000 (2636 (g); CCR) An individual installing UST components manufacturer's refresher training required (date) - July 1, 2001 (2715 (g)(1); CCR) Manufacturer's refresher training required for UST installers after (date) - July 1, 2001 (2715 (h); CCR) Under Dispenser Containment (UDC) required for all USTs (date) - December 31, 2003 (2636 (g)(C); CCR) Secondary Containment Testing for USTs installed prior to 1/1/2001 (date) - January 1, 2003(2637) Secondary Containment constructed to prevent any water intrusion (date) - July 1, 2003 (25290.2 (c); H&SC) Product tight means impervious to liquid and vapor of substance inside (date) - July 1, 2003 (25290.2 (a); H&SC)

Vista previa del contenido

UST Dates and Frequency Secondary containment required for all new USTs (date) - ✔✔ January 1, 1984 (25291; H&SC) 23 CCR closure requirements do not apply to UST closed prior to ____________________ (date) - ✔✔ January 1, 1984 (2670(I); CCR) New UST with pressured piping must have secondary containment after __________________(date) - ✔✔ July 1, 1987 (25291; H&SC) Spill Containment required for all USTs (date) - ✔✔ December 22, 1998 (2665; CCR) Overfill protection required for all USTs (date) - ✔✔ December 22, 1998 (2665; CC R) Secondary Containment required for all non -motor vehicle fuel USTs (date) - ✔✔ December 22, 1998 (2662 (b); CCR) Striker Plates required (date) - ✔✔ December 22, 1998 (2662; CCR) Single wall steel USTs required cathodic protection & lining or bladder (date) - ✔✔ December 22, 1998 (2662 (c); CCR) Shut down and fail safe LLDs required for single wall pressurized piping (date) - ✔✔ December 22, 1998 (2666 (c); CCR) Under Dispenser C ontainment (UDC) required for newly installed USTs (date) - ✔✔ January 1, 2000 (2636 (g); CCR) An individual installing UST components manufacturer's refresher training required (date) - ✔✔ July 1, 2001 (2715 (g)(1); CCR) Manufacturer's refresher trainin g required for UST installers after (date) - ✔✔ July 1, 2001 (2715 (h); CCR) Under Dispenser Containment (UDC) required for all USTs (date) - ✔✔ December 31, 2003 (2636 (g)(C); CCR) Secondary Containment Testing for USTs installed prior to 1/1/2001 (date ) - ✔✔ January 1, 2003

Información del documento

Subido en
6 de enero de 2024
Número de páginas
7
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$7.69

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Brainarium
3.8
(342)
Vendido
2074
Seguidores
1049
Artículos
24552
Última venta
21 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes