Millwright-Installation & Levelling Correct 100%
Millwright-Installation & Levelling CMost installation procedures start at the machine foundation substructure because? a. the manual says so b. the foundation introduces misalignments in the equipment c. the foundation moves d. the foundation is inconsistant - ANSWER b. the foundation introduces misalignments in the equipment When installing on concrete, millwrights usally start their installation on? a. level ground b. tempered ground c. the assumption that they will have to install anchor bolts d. exsiting anchor bolts - ANSWER d. exsiting anchor bolts Foundations are usually constructed with a. minus elevation b. positive elevation c. plane elevation d. on set elevation - ANSWER a. minus elevation This eliminates foundation shrinkage, 38mm is left for shims and grouting What is used to firmly secure the machine baseplate or soleplates to a concrete foundation? - ANSWER Anchor Bolts How far should straight anchor bolts without deformed ends be set into the foundation? a orrect 100%
Escuela, estudio y materia
- Institución
- Millwright-Installation & Levelling
- Grado
- Millwright-Installation & Levelling
Información del documento
- Subido en
- 7 de diciembre de 2023
- Número de páginas
- 3
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
millwright installation levelling correct 100
-
millwright installation levelling
-
most installation procedures start at the machine
-
when installing on concrete millwrights usally st