BECC MOD 2 Test Q A s fully solved
BECC MOD 2 Test Q A sThe backbone of a ship is referred to as the - correct answer keel Compartments located completely on the Starboard side of the centerline are assigned ...... numbers as the third digit in a compartment number - correct answer odd Primary monitoring of the fireman system is conducted from - correct answer damage control central (DCC). Which type of fire main system is located near the centerline of the ship that extends forward and aft on the damage control deck to supply the required fire main services? - correct answer single main What is the proper sequence to align an installed eductor for operation? - correct answer discharge valve, fire main actuation valve, bilge suction valve Which drainage system runs through the main machinery spaces on a Navy ship? - correct answer main (True/False) To prevent possible flooding in the compartment, the bilge sections must be closed at all times when NOT in use - correct answer true The maximum suction lift of an electrical submersible pump is ..... to ..... feet - correct answer 16;20 The discharge hose used with the S-Type eductor is ...... inches - correct answer 2 1/2 In an emergency the electrical submersible pump can be used to pump navy distillate (ND), diesel oil (DEM). and jet fuel (JPS) only after permission is given by - correct answer CO The P-IOO Pump should be carried by a minimum of ..... personnel. - correct answer 2 When using the electrical submersible pump with a suction hose, no more than ..... feet of hose should be used. - correct answer 20 The operator of the electric submersible pump should wear .... - correct answer rubber boots, rubber gloves, and stand on a rubber mat What are two types of eductors? - correct answer peri jet and s-type Which is NOT a component of the P-IOO? - correct answer 4 inch discharge hose How many methods are there for making temporary repairs of a hole? - correct answer 2 What type of patch would you use for holes up to 18 inches in diameter? - correct answer folding patch plate A rubber gasket on a pipe patch will extend ..... inch(s) on all sides. - correct answer 2 What are the two available sizes of the EWARP? - correct answer 2 inches X 5 feet and 4 inches X 15 feet (True/False) The strongest type of shoring is the k Type. - correct answer false To find the length of a wedge you would use... - correct answer 6 X minimum butt thickness Wood shores are stowed in designated rack locations above the waterline and are usually .... to .... feet in length - correct answer 16;18 What is the first thing that should be done during pipe patching activities? - correct answer secure power in flooded compartment
Información del documento
- Subido en
- 8 de noviembre de 2023
- Número de páginas
- 7
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas