Tertiary and Vocational Education Commission
Knowledge Assessment – January 2020
Quantity Surveying Assistant
National Vocational Qualification - Level 04
Time: 03 Hours
Instructions for the Candidates
The 1st Part of this question paper consists of 30 Multiple Choice Questions (MCQ). Answer
all the questions. Choose the most suitable answer from the given four answers of each and
mark as “X” in the appropriate places of the answer sheet
Answering Question Numbers 1 in Part 2 is Compulsory. Answer only one question from the
remaining 2 questions in part 2
Use of Calculator and BSR Sheet are allowed.
This question paper consists of 08 pages.
Using SLS 573 in the exam hall is allowed.
Take off sheets, Bill Sheet, abstract sheet, query sheets to be issued to candidate for part 2.
Part 1
1. Which document is not a standard method of measurement
a. SLS 573
b. SBD 02
c. SMM7
d. CESMM7
2. What is the Item we can apply time related cost in the Preliminaries bill in the BOQ
a. Temporary Site offices
b. Insurances
c. Temporary Electricity and water
d. Service authority connection charges
3. What is the item we can price as Day works
a. Concrete work
b. De watering
c. Bar bending
d. Site clearance
4. The correct order of BOQ (Bill Sheet) page is
a. Item/No, Description, Unit, Quantity, Rate, Amount
b. Drawing ref, Description, Quantity, Unit, Rate, Amount
c. Unit, Quantity, Description, Rate, Amount
d. Item/No., Description, Quantity, Rate, Amount
Page 1 of 8
Tertiary and Vocational Education Commission January 2020
, 5. Which area that we can measure under „CESMM‟
a. Civil work, roads etc.,
b. External Services
c. Pipe work
d. Roof water proofing
6. Purpose of using Query sheet is
a. To Calculate price
b. To write measurement details
c. To order specified materials
d. To obtain proper details from Client/Engineer
7. Which of the following reasons is not a main purpose of B.O.Q.?
a. Help to Prepare payment applications and maintain cash flow
b. As a one of the main document for tendering
c. Assess total project cost and variations
d. Check progress at site
8. What is the document of condition of contract
a. SLS 573
b. SMM 07
c. FIDIC
d. POMI
9. What is the main purpose of Earth work supports
a. To Bear total Load of soil
b. To make good surface to lay Rubble work
c. To maintain working surface and to keep dust free workplace
d. To maintain uniformity
10. What is not the content of BOQ
a. Preamble notes
b. Principle Quantities
c. Construction program
d. Provisional sums
11. What are the contents in the Preamble notes
a. Amendments to SMM
b. Quality, Material Specification, Standards of workmanship etc
c. Pricing instructions and other information to contractor
d. Architectural details
Page 2 of 8
Tertiary and Vocational Education Commission January 2020
Knowledge Assessment – January 2020
Quantity Surveying Assistant
National Vocational Qualification - Level 04
Time: 03 Hours
Instructions for the Candidates
The 1st Part of this question paper consists of 30 Multiple Choice Questions (MCQ). Answer
all the questions. Choose the most suitable answer from the given four answers of each and
mark as “X” in the appropriate places of the answer sheet
Answering Question Numbers 1 in Part 2 is Compulsory. Answer only one question from the
remaining 2 questions in part 2
Use of Calculator and BSR Sheet are allowed.
This question paper consists of 08 pages.
Using SLS 573 in the exam hall is allowed.
Take off sheets, Bill Sheet, abstract sheet, query sheets to be issued to candidate for part 2.
Part 1
1. Which document is not a standard method of measurement
a. SLS 573
b. SBD 02
c. SMM7
d. CESMM7
2. What is the Item we can apply time related cost in the Preliminaries bill in the BOQ
a. Temporary Site offices
b. Insurances
c. Temporary Electricity and water
d. Service authority connection charges
3. What is the item we can price as Day works
a. Concrete work
b. De watering
c. Bar bending
d. Site clearance
4. The correct order of BOQ (Bill Sheet) page is
a. Item/No, Description, Unit, Quantity, Rate, Amount
b. Drawing ref, Description, Quantity, Unit, Rate, Amount
c. Unit, Quantity, Description, Rate, Amount
d. Item/No., Description, Quantity, Rate, Amount
Page 1 of 8
Tertiary and Vocational Education Commission January 2020
, 5. Which area that we can measure under „CESMM‟
a. Civil work, roads etc.,
b. External Services
c. Pipe work
d. Roof water proofing
6. Purpose of using Query sheet is
a. To Calculate price
b. To write measurement details
c. To order specified materials
d. To obtain proper details from Client/Engineer
7. Which of the following reasons is not a main purpose of B.O.Q.?
a. Help to Prepare payment applications and maintain cash flow
b. As a one of the main document for tendering
c. Assess total project cost and variations
d. Check progress at site
8. What is the document of condition of contract
a. SLS 573
b. SMM 07
c. FIDIC
d. POMI
9. What is the main purpose of Earth work supports
a. To Bear total Load of soil
b. To make good surface to lay Rubble work
c. To maintain working surface and to keep dust free workplace
d. To maintain uniformity
10. What is not the content of BOQ
a. Preamble notes
b. Principle Quantities
c. Construction program
d. Provisional sums
11. What are the contents in the Preamble notes
a. Amendments to SMM
b. Quality, Material Specification, Standards of workmanship etc
c. Pricing instructions and other information to contractor
d. Architectural details