FURTHER MATHEMATICS Paper 3 Discrete
A-level FURTHER MATHEMATICS Paper 3 Discrete Wednesday 14 June 2023 Afternoon Time allowed: 2 hours Materials You must have the AQA Formulae and statistical tables booklet for A‑level Mathematics and A‑level Further Mathematics. You should have a graphical or scientific calculator that meets the requirements of the specification. You must ensure you have the other optional Question Paper/Answer Book for which you are entered (either Mechanics or Statistics). You will have 2 hours to complete both papers. Instructions Use black ink or black ball‑point pen. Pencil should only be used for drawing. Fill in the boxes at the top of this page. Answer all questions. You must answer each question in the space provided for that question. If you require extra space for your answer(s), use the lined pages at the end of this book. Write the question number against your answer(s). Do not write outside the box around each page or on blank pages. Show all necessary working; otherwise marks for method may be lost. Do all rough work in this book. Cross through any work that you do not want to be marked. Information The marks for questions are shown in brackets. The maximum mark for this paper is 50. Advice Unless stated otherwise, you may quote formulae, without proof, from the booklet. You do not necessarily need to use all the space provided. PB/KL/Jun23/E4 7367/3D Answer all questions in the spaces provided. 1 The simple-connected graph G is shown below. box The graph G has n faces. State the value of n Circle your answer. [1 mark] 2 3 4 5 2 Jonathan and Hoshi play a zero-sum game. The game is represented by the following pay-off matrix for Jonathan. Hoshi Jonathan The game does not have a stable solution. Which strategy should Jonathan never play? Circle your answer. [1 mark] J1 J2 J3 J4 3 A student is solving a maximising linear programming problem. The graph below shows the constraints, feasible region and objective line for the student’s linear programming problem. y 250 225 200 box 175 150 125 100 75 50 25 0 B C Feasible region A D 0 25 50 75 175 200 225 250 x Objective line Which vertex is the optimal vertex? Circle your answer. [1 mark] A B C D Turn over for the next question Turn over 4 The network below represents a system of water pipes in a geothermal power station. The numbers on each arc represent the lower and upper capacity for each pipe in gallons per second. box 5, 24 A 7, 23 0, 14 B 3, 9 6, 12 4, 15 D 6, 9 E 5, 18 1, 30 2, 21 7, 11 G 2, 15 H J 8, 17 C 3, 28 3, 10 7, 15 F I 8, 22 The water is taken from a nearby river at node A The water is then pumped through the system of pipes and passes through one of three treatment facilities at nodes H, I and J before returning to the river. 4 (a) The senior management at the power station want all of the water to undergo a final quality control check at a new facility before it returns to the river. Using the language of networks, explain how the network above could be modified to include the new facility. [2 marks] 4 (b) Find the value of the cut {A, B, C, D, E } {F, G, H, I, J } [1 mark] 4 (c) Tim, a trainee engineer at the power station, correctly calculates the value of the cut {A, B, C, D, E, F } {G, H, I, J } to be 106 gallons per second. Tim then claims that the maximum flow through the network of pipes is 106 gallons per second. box Comment on the validity of Tim’s claim. [2 marks] Turn over for the next question Turn over 5 A student is solving the following linear programming problem. Minimise Q ¼ —4x — 3y subject to x þ y ≤ 520 2x — 3y ≤ 570 and x ≥ 0, y ≥ 0 5 (a) The student wants to use the simplex algorithm to solve the linear programming problem. They modify the linear programming problem by introducing the objective function P ¼ 4x þ 3y box and the slack variables r and s State one further modification that must be made to the linear programming problem so that it can be solved using the simplex algorithm. [1 mark] 5 (b) (i) Complete the initial simplex tableau for the modified linear programming problem. [2 marks] P x y r s value 5 (b) (ii) Hence, perform one iteration of the simplex algorithm. [2 marks] box P x y r s value 5 (c) The student performs one further iteration of the simplex algorithm, which results in the following correct simplex tableau. P x y r s value 1 0 0 18 5 1 5 1986 0 0 1 2 5 1 — 5 94 0 1 0 3 5 1 5 426 5 (c) (i) Explain how the student can tell that the optimal solution to the modified linear programming problem can be determined from the above simplex tableau. [1 mark] 5 (c) (ii) Find the optimal solution of the original linear programming problem. [2 marks] Turn over (07) 6 A council wants to grit all of the roads on a housing estate. The network shows the roads on a housing estate. Each node represents a junction between two or more roads and the weight of each arc represents the length, in metres, of the road. box A 250 B 400 C 300 D 150 E 350 I 250 300 300 350 350 350 300 300 J 300 200 M K 300 G 300 300 400 400 325 350 H 150 L 250 N 250 O P 300 Q The total length of all of the roads on the housing estate is 9175 metres. In order to grit all of the roads, the council requires a gritter truck to travel along each road at least once. The gritter truck starts and finishes at the same junction. 6 (a) The gritter truck starts gritting the roads at 7:00 pm and moves with an average speed of 5 metres per second during its journey. Find the earliest time for the gritter truck to have gritted each road at least once and arrived back at the junction it started from, giving your answer to the nearest minute. Fully justify your answer. [6 marks] (0 ) box 6 (b) Explain how a refinement to the council’s requirement, that the gritter truck must start and finish at the same junction, could reduce the time taken to grit all of the roads at least once. [2 marks] Turn over 7 Nova Merit Construction are planning a building project. The planning involves producing an activity network for the project, which is shown in Figure 1 below. The duration of each activity is given in weeks. Figure 1 Latest finish time Duration Earliest start time box 7 (a) (i) Find the earliest start time and the latest finish time for each activity and write these values on the activity network in Figure 1 [2 marks] 7 (a) (ii) Write down the critical path. [1 mark] 7 (b) On Figure 2 below, draw a cascade diagram (Gantt chart) for the planned building project, assuming that each activity starts as early as possible. box [3 marks] Figure 2 0 5 10 15 20 25 30 35 40 45 50 55 60 Weeks 7 (c) During further planning of the building project, Nova Merit Construction find that activity F is not necessary and they remove it from the project. Explain the effect removing activity F has on the minimum completion time of the project. [2 marks]
Escuela, estudio y materia
- Institución
- FURTHER MATHEMATICS
- Grado
- FURTHER MATHEMATICS
Información del documento
- Subido en
- 15 de octubre de 2023
- Número de páginas
- 28
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Solo preguntas
Temas
-
further mathematics paper 3 discrete wednesday 14