100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

SOS NERC Prep - RElIABILITY Exam | latest 2023/24 with complete solution

Puntuación
-
Vendido
-
Páginas
49
Grado
A+
Subido en
15-10-2023
Escrito en
2023/2024

SOS NERC Prep - RElIABILITY Exam | latest 2023/24 with complete solution The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net Interchange Schedule by 20 MWs. D) Increase Net Interchange Schedule by 10 MWs. - A) Increase Net Interchange Schedule by 20 MWs. A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen instantaneously in the change of which of the following values? 1. Actual Net Interchange 2. Scheduled Frequency 3. Scheduled Net Interchange 4. Area Control Error A) 4 only B) 1 & 3 C) 1 & 4 D) 3 & 4 - C) 1 & 4 Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties, actual frequency, and all __________. A) Tie lines readings B) Generators output C) Scheduled frequency indications D) Transformer load - A) Tie lines readings Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If Balancing Authority A's frequency bias setting is 100 MW/0.1 Hz, what is ACE? A) -100 B) 0 C) 10 D) 100 - A) -100 A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to 1600 on a summer day. The Net Interchange Actual for those same hours respectively were -230 MW, -275 MW, -250 MW and -270 MW. What was the Balancing Authority's Inadvertent Interchange for the 4-hour period? A) 6 MWs out B) 25 MWs in C) 25 MWs out D) 6 MWs in - B) 25 MWs in For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency, and all ________________ must be metered. A) Generation B) Communications C) Transformers D) Tie lines - D) Tie lines If the frequency bias setting is set to a less negative value than the frequency response of a Balancing Authority and a frequency increase is caused by a sudden loss of load in an external balancing area, what will be the result? A) The ACE will be zero and will take no AGC action B) The ACE will be a negative value and AGC will increase generation C) The ACE will be a positive value and AGC will lower generation D)This will not affect the ACE - B) The ACE will be a negative value and AGC will increase generation If the frequency bias setting is less negative than the frequency response of a Balancing Authority and a frequency decline is caused by a sudden loss of generation in an external balancing area, what will be the result? A) The ACE will be a negative value and AGC will increase generation. B) This will not affect the ACE. C) The ACE will be a positive value and AGC will lower generation. D) The ACE will be zero and will take no AGC action. - C) The ACE will be a positive value and AGC will lower generation. It is the responsibility of which entity/entities to develop, maintain, and implement load shedding plans? A) Transmission Operators and Balancing Authorities B) Reliability Coordinator C) Load Serving Entities D) Balancing Authority - A) Transmission Operators and Balancing Authorities A Transmission line is loaded 25% above its SOL. A parallel line is out for routine maintenance and can be placed in service in 10 minutes. What is the first step the Operator should take to reduce the line loading? A)Shed load at the downstream bus. B) Open the line. C) Re-Dispatch Generation. D) Initiate the restoration of the parallel line. - D) Initiate the restoration of the parallel line. As a Transmission Operator, you realize that the voltage level is starting to decline in the North West part of the system. Which of the following devices should you, as a Transmission Operator, be able to operate, and/or have another entity operate to raise the voltage level back to normal in the North West part of the system? A) Transformer Underload Tap Changers B) Shunt Capacitor Banks C) Generator Reactive Output D) All answers are correct - D) All answers are correct Voltage reduction for load relief should be made on the __________. A) Distribution system B) Entire Interconnection simultaneously C) Tie-lines with other Balancing Authority Areas D) Transmission System - A) Distribution system Under Frequency Load Shedding (UFLS) is to stabilize the imbalance between generation and load that has been created by a system disturbance. This is accomplished by ____________. A) Tripping generation first B) Voltage reduction on the distribution system. C) Shedding all load to arrest frequency D) Shedding load prior to generation tripping - D) Shedding load prior to generation tripping Failure to meet the DCS criteria of recovery within 15 minutes results in which consequence for a specified time period for the Balancing Authority's failure to recover? A) Increased Contingency Reserve requirements B) Decertification as a Balancing Authority C) Not allowed to supply regulation services D) Expulsion from the Reserve Sharing Group - A) Increased Contingency Reserve requirements A Balancing Authority foresees or is experiencing conditions where all available resources are committed to meet firm load, and firm transactions. The BA should request which level of the Energy Emergency Alerts? A) Energy Emergency Alert Level 2 B) Energy Emergency Alert Level 4 C) Energy Emergency Alert Level 1 D) Energy Emergency Alert Level 3 - C) Energy Emergency Alert Level 1 Preparations are being made to tie two islands together during restoration. Island "A" has a frequency of 58.95 Hz and Island "B" has a frequency of 59.97 Hz. What action should be taken to synchronize the two islands? A) Shed load in Island "B" B) Shed load in Island "A". C) Disable the Synch Check Relay. D) Increase generation in Island "B". - B) Shed load in Island "A". You experience a full system shutdown. You are in the process of restoring load and you are concerned about re-collapsing the system. Which is the best approach in the restoration process that will help ensure your system will be restored successfully? A) Maintain frequency between 59.5 HZ and 60.5 HZ. B) If the system has stabilized at below 60 HZ, shed 15% - 20% of the load to raise the frequency to 61 HZ. C) Avoid energizing loads in excess of 5% of the online generation capacity of the system. D) Operating reserves should be maintained to cover the largest generator currently in service. - C) Avoid energizing loads in excess of 5% of the online generation capacity of the system. In the event a Balancing Area experiences multiple contingencies occurring within _________ of each other, it shall be treated as a single contingency. A) five minutes B) one minute or less C) fifteen minutes D) two minutes - B) one minute or less When coordinating under frequency load shedding and under frequency generator tripping the _____________________________. A) generators should trip before the UFLS B) load should not be shed during the process C) generators should trip after the UFLS

Mostrar más Leer menos
Institución
SOS NERC
Grado
SOS NERC











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
SOS NERC
Grado
SOS NERC

Información del documento

Subido en
15 de octubre de 2023
Número de páginas
49
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$10.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
STUVEX NURSING
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
734
Miembro desde
2 año
Número de seguidores
313
Documentos
15295
Última venta
4 días hace
STUVATE - STUVIA USA

My store is a comprehensive destination for buying and selling a variety of documents. we offer a vast range of documents that cater to different needs and requirements, our documents are well-researched, accurate, and of high quality, ensuring customer satisfaction. whether you are looking for legal documents, academic papers, business reports or miscellaneous documents we`ve got you covered.

3.8

114 reseñas

5
45
4
29
3
23
2
7
1
10

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes