Consider the following project network, with task duration data (in days provided) A1,B4,C2,D2,E7,F1,G2,H3,I1,J1 Which of the following is the completion time for this project? correct answer: 11 days Which two steps in the forecasting process are most likely to get skipped or ignored in practice? correct answer: Validation and monitoring Calculate MAD using the following data. Demand for the past 4 periods was: 342,355,349,348; Forecasts for the past 4 periods was: 347,349,348,348 correct answer: 3 Calculate CFE using the following data: Demand in periods 1-3 was: 225,232,222. The forecast for the same periods was: 229,231,225 correct answer: -6 Calculate MSE using the following data. Demand for the past 3 periods was: 151,171,147; Forecast was: 162,156,165 correct answer: 223.33 Calculate a weighted moving average forecast for period 6, using the following data. Weights: use .5 as weight for most recent demand, use .3 as weight for next most recent demand and use .2 as weight for the next most recent demand; Demand for periods 1-5 are 501,492,499,505,496. correct answer: 499.3 In an AON project network, nodes of the network represent the activities correct answer: True Costs that are allocated to a project generally increase as project duration increases, while direct costs of a project may generally decrease as project duration increases correct answer: True The mean expected completion time for a project is 21 weeks. The critical path for the project is A-C-F. What is the probability that the project will get done in 24 weeks? TASK Variance A 3 B 4 C 5 D 2 E 1 F 1 correct answer: 0.8413 A forward pass is used in evaluating a. project network to determine earliest start time and latest start time for each task correct answer: False The choice of which sequencing rule to use in production scheduling does not need to be related to the firms operations strategy correct answer: False In scheduling, the term "sequencing" refers to allocating work to machines or work centers (assuming that adequate materials, machines, and labor are available correct a
Información del documento
- Subido en
- 11 de octubre de 2023
- Número de páginas
- 16
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas