Known Nerc Exam Questions: From Class

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

KNOWN NERC EXAM QUESTIONS: From Class A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS - b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing Area A b) A net under-generation in the Interconnection c) A loss of load in Balancing Area A d) A loss of load in the Interconnection - b) A net under-generation in the Interconnection What is the penalty for a Balancing Authority violating the Disturbance Control Standard? a) Must carry additional Contingency Reserve b) Must develop a correction action plan c) Must re-evaluate and change its Frequency Bias Setting d) Must increase its Regulating Reserve - a) Must carry additional Contingency Reserve Your ACE is a large negative value and system frequency is 59.80 Hz. Your AGC system is pulsing your units down. What should you do? a) Place AGC in flat frequency control b) Place AGC in flat tie line control c) Suspend AGC and investigate d) Do nothing as this is normal - c) Suspend AGC and investigate When two identical generating units are operated in parallel on governor control, and on machine has a 5% droop and the other has a 10% droop, the unit with the greater (10%) governor droop will: a) Respond less to frequency deviations b) Respond more to frequency deviations c) Respond the same to frequency deviations d) Not adjust for frequency changes - a) Respond less to frequency deviations On a radial transmission system a generator has a capacity of 600 MWs. The Droop characteristic is at 5% and the generator is currently loaded at 300 MWs. If frequency suddenly drops to 59.3 Hz, what would be the total generator output? a) 350 b) 400 c) 440 d) 600 - c) 440 What is the main purpose of the Frequency Bias Setting in the ACE equation? a) Control frequency to 60 Hz for the entire Interconnection b) Assist with arresting frequency deviations c) Restore frequency to 60 Hz after a disturbance d) maintains frequency between 59.95 and 60.05 Hz - b) Assist with arresting frequency deviations A Balancing Authority has a Frequency Bias Setting of -200 MW/.1Hz. What is the Balancing Authority's Frequency Response for a frequency of 59.95 Hz? a) 10 MWs b) 50 MWs c) 100 MWs d) 200 MWs - c) 100 MWs Scheduled Interchange is 250 MWs and Actual Interchange is 285 MWs. The Bias Setting is 35 MW/.1Hz and frequency is 60.00 Hz with no time error correction in effect. Frequency suddenly drops to 59.80 Hz. What does ACE indicate after the disturbance? a) 70 MW under-generating b) 70 MW over-generating c) 35 MW under-generating d) 35 MW over-generating - d) 35 MW over-generating Inadvertent energy accumulation occurs due to a difference in Net Actual Interchange and Net Interchange Schedule over time. This energy accumulation can be paid back unilaterally by adjusting delivery of power: a) During off-peak periods b) During periods corresponding to those in which the inadvertent energy was accumulated c) On weekends d) Unilaterally when economically beneficial - B) During periods corresponding to those in which the inadvertent energy was accumulated You are the Source Balancing Authority for an Arranged Interchange Transaction request. The request has a non-standard ramp rate specified. What action should you take? a) Deny the request b) Approve the request if able to accommodate c) Ignore the request d) Call the Reliability Coordinator for guidance - b) Approve the request if able to accommodate Who must approve an Interchange Transaction before it becomes Confirmed Interchange? a) Balancing Authority b) Reliability Coordinator c) Transmission Operator d) Interchange Coordinator - a) Balancing Authority A Balancing Authority is scheduled to receive 300 MWs from the north and 400 MWs from the south for hour ending 1300. The north schedule is curtailed starting at 1220 with a 10-minute ramp. What is the Net Interchange for the hour? a) 450 MWh b) 500 MWh c) 550 MWh d) 600 MWh - b) 500 MWh A transaction of 100 MWs is scheduled out of your area at the top of the hour with a 10-minute ramp. You have the following generation available: What combination of generation would need to be used? Generator________MWs_________ Curren MWs________ Ramp Capability 1_____________________100 MW______50 MW________________5 MW/min 2____________________100 MW______40 MW________________3 MW/min 3____________________100 MW______50 MW________________1 MW/min 4____________________100 MW______60 MW________________2 MW/min a) Generators 1, 2 & 3


Información del documento

Subido en
10 de octubre de 2023
Número de páginas
6
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
STUVEX
3.8
(123)
Vendido
834
Seguidores
314
Artículos
16233
Última venta
6 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.