Sos Nerc Prep - Reliability Exam | Latest 2023/24 | Graded A+

Document preview thumbnail
Vista previa 4 fuera de 49 páginas

SOS NERC Prep - RElIABILITY Exam | LATEST 2023/24 | GRADED A+ The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net Interchange Schedule by 20 MWs. D) Increase Net Interchange Schedule by 10 MWs. - A) Increase Net Interchange Schedule by 20 MWs. A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen instantaneously in the change of which of the following values? 1. Actual Net Interchange 2. Scheduled Frequency 3. Scheduled Net Interchange 4. Area Control Error A) 4 only B) 1 & 3 C) 1 & 4 D) 3 & 4 - C) 1 & 4 Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties, actual frequency, and all __________. A) Tie lines readings B) Generators output C) Scheduled frequency indications D) Transformer load - A) Tie lines readings Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If Balancing Authority A's frequency bias setting is 100 MW/0.1 Hz, what is ACE? A) -100 B) 0 C) 10 D) 100 - A) -100 A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to 1600 on a summer day. The Net Interchange Actual for those same hours respectively were -230 MW, -275 MW, -250 MW and -270 MW. What was the Balancing Authority's Inadvertent Interchange for the 4-hour period? A) 6 MWs out B) 25 MWs in C) 25 MWs out D) 6 MWs in - B) 25 MWs in For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency, and all ________________ must be metered. A) Generation B) Communications C) Transformers D) Tie lines - D) Tie lines If the frequency bias setting is set to a less negative value than the frequency response of a Balancing Authority and a frequency increase is caused by a sudden loss of load in an external balancing area, what will be the result? A) The ACE will be zero and will take no AGC action B) The ACE will be a negative value and AGC will increase generation C) The ACE will be a positive value and AGC will lower generation D)This will not affect the ACE - B) The ACE will be a negative value and AGC will increase generation If the frequency bias setting is less negative than the frequency response of a Balancing Authority and a frequency decline is caused by a sudden loss of generation in an external balancing area, what will be the result? A) The ACE will be a negative value and AGC will increase generation. B) This will not affect the ACE. C) The ACE will be a positive value and AGC will lower generation. D) The ACE will be zero and will take no AGC action. - C) The ACE will be a positive value and AGC will lower generation. It is the responsibility of which entity/entities to develop, maintain, and implement load shedding plans? A) Transmission Operators and Balancing Authorities B) Reliab


Información del documento

Subido en
10 de octubre de 2023
Número de páginas
49
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$9.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
STUVEX
3.8
(123)
Vendido
833
Seguidores
314
Artículos
16233
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.