CMP 101 Final (Graded A+ Already)
As a construction manager for a road construction project, you would perform the following tasks: (Select all that apply) - Hire skilled workers to perform the construction work - Manage the finances to ensure the project makes profit. - Operate all road building equipment - Ensure the project is completed on time correct answers - Hire skilled workers to perform the construction work - Manage the finances to ensure the project makes profit. - Ensure the project is completed on time For CMP101, what are the 2 types of construction? - Building and Non-building construction - Residential and Commercial construction correct answers Building and Non-building construction GC is an acronym for which one of the following? - Generic Construction - General Contractor - Genoa City - General Construction - None of these correct answers General Contractor On a NON-RESIDENTIAL construction project, the Owner may directly hire the following entities: (SELECT ALL THAT APPLY) - Electrical Engineer - Architect - Masonry Contractor - Prime Contractor - Construction Manager correct answers - Architect - Construction Manager On a residential construction project from the following construction activities, what activity would be performed first - Backfilling around foundation - Installing Formwork for foundation - Does not matter - Either one of these can be performed first. - Pouring concrete for foundation - Excavation for foundation correct answers Excavation for foundation Mechanical Plans are labeled in the title box as _______________ for the first mechanical plan. - None of these - E1
Información del documento
- Subido en
- 29 de septiembre de 2023
- Número de páginas
- 16
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas