CMP 385 Exam 2 (with Complete Solutions)
Stipulated Sum correct answers The General contract of the A101 requires that the sum of the project be submitted as a whole dollar amount in the contract. "Lump sum" - same meaning Substantial Performance correct answers The owner "in essence" got what they bargained for owner is able to occupy the building for its intended use Strict Compliance correct answers Literal compliance with the contract language means, methods, and requirements specified in the contract agreement Unjust enrichment correct answers Benefiting from the loss of another party in the contract agreement Example: Gaining extra money on the job due to the losses of another party that were directly avoidable diminished value correct answers The loss in value of an item/building based on the improper installation. Normally a loss of occurred from the failure to meet strict compliance. Economic Waste correct answers have to prove economic waste to use strict compliance on a site. This is an expression that there will be lost economic value from completing a job a certain way (the way the contract calls for) countered by value engineering - call for a more efficient (monetary and time) way of doing something on the site with no diminished value Alternates accepted correct answers Alternate construction materials that will perform the same way in a building Alternates are to be listed in the contract itself, and must have a price attached to them - approved by all parties argued that they cost less, or may be easier to install - backs the theory of Economic Waste on a job site Unit Price correct answers Break down of building materials by their name and their respective cost.
Información del documento
- Subido en
- 29 de septiembre de 2023
- Número de páginas
- 21
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas