Lecture 7:
 Intrenched in legislation – in acting principles that found in constitution.
o Avenue of being enforced (NEMA) – what are principles that contained
and required for authorisation processes?
 Specific environmental management act (SEMAs) = waste management act,
biodiversity act, water act, heritage resources act, integrated coastal management
act
 May trigger environmental authorisation under NEMA but does not exclude SEMA
(can trigger in both forms of legislation).
o SEMA different application but run concurrently with NEMA (if air quality listed
activity and air quality for approval)
o Know different legislation – scope of the act (what is applicable to).
o Show if there are different authorizations required under the act.
 NEMA environmental authorisation types:
o Basic assessment process
 Smaller scale development when knowing the potential impacts (takes
180 – 200 days)
 Legislation tell the timeframes – can’t lapse then have to restart (high
cost)
 R2000 application.
o Scoping and EIA processes
 300-350 days
 Types of large-scale of development and the impacts are significant
and unknown.
 Large amount of specialist’s studies
 R10000 application fee.
o Section 24G process (listed activity has commenced without authorisation –
farmers starting development without authorisation)
 No timeframes associated.
 Levees – depending on how bad then administer fine that vary
between R200000 – R10 million.
 Generic EIA process (full scoping)
o Project
o Screening
 EIA not required.
 EIA required.
 Scoping
 Impact assessment
 Draft environmental management plan
 EIA report
 Review
 Decision
o Approved
o Not approved



 Screening: proponent provides a detailed project description (normally has
associated activities which may trigger) – location and the associated infrastructure
o Listing notices 1 and 3: basic assessment processes

,  Listing notices 3 refers to specific regions and differs in different
provinces (dependent on the project and look at the specific areas that
trigger the listing)
o Listing notices 2: full scoping and EIA
o There have been many amendments since NEMA started but the most
relevant is 2017.
o Listing shows different thresholds and take note of the fact that in listing
notice of and/ or factors when both.
 If not over the threshold, then does not require EIA.
 Definitions are important for explanation to differentiate concepts.
o Exclusions are included.
o Identified potential listed activities – different provinces and look at
applicability checklist (may be excluded but need confirmation from listed
authorities)
 Proposed development and list associated activities that are thought
applicable or not applicable and then the government will give
documented proof.
 The national government doesn’t have an applicability checklist.
o Always make sure up to date with the correct application form.
o Screening tool: potential things associated with the development (help
standardize for EAPs, and help determine the kind of specialists required,
bought out by the government)
 Screening tool report must be attached to all final document reports.
 Can dispute information because the screening tool uses
historical data and therefore requires specialists to prove if the
themes in the screening tool are correct.
 High sensitivity rating in theme then full scoping but if low then
can say no further specialists are required, just a compliance
statement unless specialists say that don’t need it because not
present.
 Very high, high and medium require specialists.
o Site verification when EAP agrees or disagrees with the screening tool.
o A site visit is always required by law to be done.
o Determine specialists and technical inputs required from the screening tool
and therefore if full application.
 Have to identify authority for an application form that has all the
information – CV of the person conducting.
 Submit notice of intent of application
 Arrange a pre-application meeting with the competent official.
o Before submitting the application have to have a draft and then have done 30
days of public participation and therefore have to submit upfront.


 From 2022 have to be registered EAPs to all EIA.
 Development setback: setback line defined or adopted by the competent authority
(doesn’t look at large area when there is only one triggered activity and want to
exclude that then only have in the area of development and exclude notice)
o Won’t know if someone has applied for a setback line – would have to ask
authority.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
27 de septiembre de 2023
Número de páginas
12
Escrito en
2023/2024
Tipo
NOTAS DE LECTURA
Profesor(es)
Kim
Contiene
Todas las clases

Temas

$3.69
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
shannonhyslop

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
shannonhyslop Stellenbosch University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
7
Miembro desde
3 año
Número de seguidores
4
Documentos
19
Última venta
1 año hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes