CEPSCI Test Review
Erosion The process by which the land surface is worn away by the action of water, wind, ice and gravity. Natural Erosion (Geological Erosion) All natural process which generally occurs along shorelines and stream channels producing about 30% of eroded sediment in the US Accelerated Erosion Erosion at an elevated rate because of human activity; accounts for 70% of eroded sediment in the US Sedimentation The process by which eroded material is transported and deposited 1972-Clean Water Act Administered by the US Environmental Protection Agency (EPA); Created the NPDES permitting process. 1987 Water Quality Act Amendment to CWA which required the EPA to develop a program to regulate storm discharges under NPDES program. NPDES in South Carolina NPDES regulations are administered by SCDHEC; EPA does have authority to exert jurisdiction in SC; CGP is one of several NPDES permits administered by DHEC. CGP Authorizes storm water discharges from construction sites. Who must obtain NPDES coverage? Land disturbing activities greater than or equal to 1 acre; Land disturbance less that 1 acre within 1/2 mile of a receiving water body in the SC Coastal Zone; exceptions of single family residential developments not apart of a larger common plan of development. Who is Permitted? (NPDES) NPDES permits are issued to an operator - person or company - for a particular discharge. Permits are NOT issued to the parcel or project. Categories of Operators Primary Permittees Secondary Permittees Contractors Lending and Other Institutions Primary Permittee Meets one or both of the following criteria; - Has operational control over SWPPP, construction plans and specifications - Has day-to-day operational control of those activities necessary to ensure compliance with the SWPPP To obtain coverage under the CGP, primary permittees must submit: - NOI - Preparation of the C-SWPPP Secondary Permittee - For residential subdivisions, permit coverage may either: continue with the primary permittee or the Primary Permittee may require builders to obtain coverage as a Secondary Permittee. - Secondary Permittee conducts land-disturbing activity limited to an individual lot or group of lots. Contractors -All entities involved with land-disturbing activities or whose work may impact the quality of storm-water runoff. - Before beginning work, contractors must participate in a pre-construction conference and complete Pre-Construction Conference Certification Form (d-0436) - Complete a Contractor Certification Form (d-0437)
Información del documento
- Subido en
- 3 de septiembre de 2023
- Número de páginas
- 9
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas