Activity Analysis, Cost Behavior, and Cost Estimation.
Activity Analysis, Cost Behavior, and Cost Estimation. 1. The relationship between cost and activity is known as: A. cost estimation. B. cost prediction. C. cost behavior. D. cost analysis. E. cost approximation. 2. A forecast of a cost at a particular level of activity is known as: A. cost estimation. B. cost prediction. C. cost behavior. D. cost analysis. E. cost approximation. 3. Which of the following costs changes in direct proportion to a change in the activity level? A. Variable cost. B. Fixed cost. C. Semivariable cost. D. Step-variable cost. E. Step-fixed cost.