Chapter 1 Certification Prep Questions|WITH 100% COMPLETE SOLUTIONS|ALREADY GRADED A
The only way to create an Xactimate estimate is through XactAnalysis. False, you can add new a new project from the Projects Tab (Page 10). With an Internet connection, you can download and upload an XactAnalysis assignment. True, with an Internet connection you can download, open, and work on a project (P9). What are the steps in the 4-step Estimating Process Claim information, Sketch, Estimate Items, Complete (P8) It is mandatory to follow the 4-step Estimating Process in its exact order. False, while the 4-steps are commonly completed in order, it is NOT MANDATORY that each step be completed in the exact order. In some situations, you may not need to create a sketch because the estimate does not rely on any building measurements (P12). At the fundamental level of learning, it is recommended to add or create a project from the "Control Center" tab. False, at the fundamental level you will use the "Projects Tab" (P10) Estimating Process: Claim Information definition You specify information about the customer, such as contact information and location of the repair (P14). Estimating Process: Sketch definition You diagram building interiors, exteriors, roofs, and other structures (P14) Estimating Process: Estimate Items definition In this step, you start adding line items to your
Escuela, estudio y materia
- Institución
- Chapter 1 Certification
- Grado
- Chapter 1 Certification
Información del documento
- Subido en
- 4 de junio de 2023
- Número de páginas
- 2
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
chapter 1 certification prep questions|with 100 c