LEED Green Associate Certification Question with complete solution 2023
LEED Green Associate Certification Question with complete solution 2023What materials qualify as "biobased" in LEED v4? Materials meeting the criteria of the Sustainable Agriculture Standard. In LEED v4 Biobased materials are no longer defined by the harvest cycle of the raw materials; instead, products must meet the Sustainable Agriculture Standard to count toward certain materials and resources (MR) credits. Which of the following materials contains pre-consumer content? Manufacturer overrun print publications that are converted to recycled paper. Pre-consumer recycled content materials are generated by manufacturers and processors, and may consist of scrap, trimmings and other by-products that were never used in the consumer market. Examples include planer shavings, sawdust, bagasse, walnut shells, culls, trimmed materials, overissue publications, and obsolete inventories. The designation excludes rework, regrind, or scrap materials capable of being reclaimed within the same process that generated them. Formerly known as postindustrial content. What is Albedo? The reflectivity of a material. Albedo is defined as the ability of a surface to reflect sunlight, or the reflectivity, of a material. "Graywater" can be reused for which of the following purposes? Toilet flushing, cooling towers and irrigation. Graywater is defined as "untreated household waste water which has not come into contact with toilet waste." Graywater includes used water from bathtubs, showers, bathroom wash basins, and water from clothes-washers and laundry tubs. It must not include waste water from kitchen sinks or dishwashers. Which of the following is NOT required for a project to become LEED certified? On site visit from a GBCI representative prior to certification. On site visit by representatives from USGBC and/or GBCI is not part of the LEED Certification process. What are some of the requirements for a project to become LEED certified? - Fundamental commissioning of the building's energy systems. - The use of a reasonable site boundary. - Commitment to sharing whole building energy water data. LEED Regional Priority credits are determined by: USGBC regional chapters. Regional Priority credits are determined by volunteers from local USGBC chapters and the LEED International Roundtable. A project team is planning a 14 story, 200 unit apartment building in New York City. The project team wants to attempt LEED certification. Which rating system should the project use? LEED for New Construction. The project team should use LEED BD+C for New Construction. If a team seeks guidance on which rating system to use, the team should employ the 40/60 rule for making a decision on which rating system to use. What is Light Pollution? Light pollution is wasted light that produces glare or is directed up toward the sky or away from the building where it should be focused.
Información del documento
- Subido en
- 14 de mayo de 2023
- Número de páginas
- 3
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas