100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Otro

Getta_Byte_Software_project Week 4 Week 4: Course Project Part 2

Puntuación
-
Vendido
-
Páginas
14
Subido en
18-04-2023
Escrito en
2022/2023

Getta Byte Software project 1.1 Project goals and objectives The Getta Byte Software project is a mission that is formed with the main goal in mind of substituting the on-going manual online-based billing system that will enable a concise, easy, and fast data entry system. It is worth noting that the existing system has the capability of helping the company to carry out the duties in daily operations. This is quite fine, but there are a few challenges that call for an online system. The first concern is that the existing system is manual and, therefore, time-consuming and very inaccurate. A lot of time is needed in entering the information into the system, and the result is the inconsistency of the data entered and, therefore, putting the company at risk. The solution to this problem is to come up with an automated system that shall be very fast and produce accurate data. The system shall be base on the online operation, which will enhance an easy way of entering the data, conceive a dynamic update towards the receivables. The system shall have a goal of saving up to 25 % of the total labor per month since human resources to operate the billing system shall be reduced. The extra cost saved by the company shall be used elsewhere and hence, raising the total profits made by the company each month. The project focuses on working with a bunch of people to spread risks in the company. These people shall include the CFO, CEO, the billing department, and also customer care services. The success of the project shall be attributed to the fact that the billing cycles are reduced to more than 30% each month. As per the project schedule, it is expected that the first piloting shall be done by September 1 st. This shall imply that the development and testing of the software shall be done by 15th August. This shall give ample time to facilitate the first piloting study and see if the system is working correctly and in accordance to the expectations and goals of the project. The final real ease of the software shall be done by September 1st, this will be after having checked all parts that are not in a good working condition and rectify them accordingly. The project is budgeted $ 250, 000 for the entire work. Therefore, the work shall be scheduled accordingly, and individual tasks split to enable the project team to carry out all duties with little or no friction. 1.2 Management of the project The project charter shall establish the needs of the project and the basic needs of the project. Besides, the person who shall be liable for carrying out the entire project is the project manager. The project manager shall then appoint their teams, such as the human resource manager, the software engineer, the project coordinator, and other different people who shall carry out duties assigned to them by the project manager. Each person shall be responsible in their area of operation to make sure that there is a smooth running of activities. The project manager role shall be to oversee the entire process and therefore, provide all the resources, including the human resource, material and cost that shall be used in the project. The project manager will also ensure that communication is done and there is adequate control of all the resources provided.

Mostrar más Leer menos
Institución
Grado









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
18 de abril de 2023
Número de páginas
14
Escrito en
2022/2023
Tipo
Otro
Personaje
Desconocido

Temas

$14.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
leedia Yale School Of Medicine
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
31
Miembro desde
3 año
Número de seguidores
26
Documentos
881
Última venta
4 meses hace

4.3

3 reseñas

5
2
4
0
3
1
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes