Question 1
Not yet graded / 20 pts
(TCO E) Using the network below and the additional information provided, find
(a) the crash cost per day per activity;
(b)which activities should be crashed to meet a project deadline of 12 days
at minimum cost; and
(c) what the extra cost is to crash the project.
Activity Normal Crash Normal Crash
Time Time Cost Cost
A 5 3 $300 $600
B 3 2 $250 $450
C 6 4 $400 $500
D 5 3 $150 $400




Your Answer:
(a)
Crash cost of A = (600-300)/(5-3) =
$150; Crash Cost of B = (450-250)/(3-
2) = $200; Crash Cost of C = (500-
400)/(6-4) = $50; Crash Cost of D =
(400-150)/(5-3) = $125; (b)
As per the above network the activities on the critical path are B, C, D with a
duration
of 14 days; less 2 days that are needed for project deadline reduction of 12
days-- therefore,an activity should be crashed. The lowest crash cost is for
Activity C---
so, Activity C should be crashed to meet project deadline of 12 days
(c)
Cost to crash the
project: Day 1 =
$50
+ Day 2 = $50
Total Extra cost $100


a) Crash cost per day


This study source was downloaded by 100000861168648 from CourseHero.com on 04-18-2023 04:50:13 GMT -05:00


https://www.coursehero.com/file/35590288/Proj592-Quizdocx/

, Activity Normal Time Crash Time Normal CostCrash Cost Crash Cost/Day A 5 3
$300 $600 $150 B 3 2 $250 $450 $200 C 6 4 $400 $500 $50 D 5 3 $150 $400
$125
$1,100



Critical path: B - C - D 14 days

(b)To reduce the schedule 2 days, crash Task C for 2 days.

(c) Cost to crash the
project C: $50
C: $50
Total extra cost: $100

(TCO E) The following information is extracted from a project to develop a
Question 2
state-of-the- art alternative power energy storage device.
Not yet graded / 20 pts
Activity Duration Predecessors Resources
A 4 days -- 1 research engineer
B 3 days A 1 marketing specialist
C 5 days A 1 design engineer
D 3 days A 1 design engineer
E 3 days B 1 prototype builder
F 2 days D 1 test engineer
The owner has stipulated that in order to provide continuity throughout the
project, the same individual must handle all activities under his or her
discipline. Activities on this project cannot be split.

a. Identify any resource conflicts in the above project. State the
activities involved, the timeframe of the conflict(s), which resources are
involved, and the quantity required.

b. Given the owner's stipulation regarding project continuity and the
need to minimize project duration, how can this conflict be resolved?
What will be the effect on the project duration?

Your Answer:
a.




This study source was downloaded by 100000861168648 from CourseHero.com on 04-18-2023 04:50:13 GMT -05:00


https://www.coursehero.com/file/35590288/Proj592-Quizdocx/

Información del documento

Subido en
18 de abril de 2023
Número de páginas
9
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas
$8.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
1
Seguidores
1
Artículos
492
Última venta
2 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes