SAFe Scrum Master 5.1 Study Guide
During PI planning who owns the planning of stories into iterations? - Answer- Agile teams Who commits to the Iteration goals at the end of Iteration planning? - Answer- Team Becoming a coach requires a shift from old behaviors to new ones. What are three examples of old behaviors? - Focusing on deadlines - Focusing on business value delivery - Asking the team for the answers - Driving toward specific outcomes - Fixing problems for the team - Facilitating team problem solving - Answer- Not sure which 3 What are 2 critical areas that differentiate agile from the waterfall development - Answer- incremental delivery of value and fast feedback Which type of enabler does a System Architect review during a System Demo? -enabler epics -enabler stories -enabler features -enabler capabilities - Answer- not sure Why do teams have an iteration Retrospective? - Answer- To Adjust and identify ways to improve Which demo is performed in the IP iteration - Answer- The PI System Demo What are two good scrum master facilitation practices - Answer- Create an environment of safety so that everyone feels comfortable contributing to the discussion Ensure all voices are heard Each PI planning meeting evolves over time, and ending PI planning with a Retrospective will help to do what? - Answer- Continuously Improve the event The business must depend on the team for what in order to do any meaningful planning - Answer- Commitment to the plan What is the purpose of the plan-do-check-adjust cycle as applied to iterations -to give the art team members a process tool to keep the train on the tracks -to create a continuous flow of work to support the delivery pipeline (not this one) -to provide a r
Información del documento
- Subido en
- 28 de marzo de 2023
- Número de páginas
- 4
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas